Status of Operationalisation of AIIMS Like Institutes: PIB

November 10th, 2010

Following is from http://pib.nic.in/release/release.asp?relid=66918.

The civil work for Package I – medical college started at all the sites in last week of May, 2010 and is scheduled to be completed in 15 months except Patna where duration is 18 months. For package II – medical college, work started in the middle of September, 2010 and it is scheduled to be completed in 24 months from commencement of work. The civil work at all the six sites is at various stages.

At Rishikesh, the provision of basement for medical college has been deleted due to high water level during excavation. Consequently, structural analysis has been re-done and designs was got revised by the Design DPR consultant. At Bhubaneswar, there was resistance from local people for mobilization of activities of the contractor. As such, the work at Rishikesh and Bhubaneswar site are slightly behind the schedule.

An amount of Rs.622.37 Crore for construction of medical colleges and an amount of Rs.1330.71 Crore for hospital complex in respect of all the six sites were allocated. Mobilization advance of 5% has so far been released.

Out of 13 institutions, 10 institutions involve both civil work and procurement of medical equipment and the remaining 3 involve mainly procurement of equipment. Civil work at 4 medical colleges, viz. Trivandrum Medical College, Bangalore Medical College, Salem Medical College and Sanjay Gandhi Postgraduate Institute of Medical Sciences, Lucknow has been completed. The work at Nizam Institute of Medical Sciences, Hyderabad; Jammu Medical College and OPD and Academic Block of Kolkata Medical College is likely to be completed by December, 2010 and remaining 3 institutions in 2011.

Procurement of medical equipments for all the 13 medical college is expected to be completed by March, 2011.

This information was given by Minister for Health and Family Welfare Shri Ghulam Nabi Azad in written reply to a question raised in Rajya Sabha today.

Entry Filed under: AIIMS, Bhubaneswar,AIIMS, Bhubaneswar,Bhubaneswar-Cuttack-Puri- Khurda area (1),PMSSY, AIIMS

1 Writeup

  • 1. mangal  |  November 20th, 2010 at 10:34 pm

    WHETHER THE GOVT HAS POSTED ANY ADMINISTRATOR FOR THIS PROJCET ?


Calendar

December 2024
M T W T F S S
 1
2345678
9101112131415
16171819202122
23242526272829
3031  

Most Recent Posts