Archive for the 'DISTRICTS & BLOCKS' Category

Arcelor-Mittal’s DPR to be made by Dastur

Arcelor Mittal, Iron Ore, Keonjhar, Steel 1 Comment »

Times of India reports that Arcelor-Mittal has hired M. N. Dastur to prepare the detailed project report of its proposed plant in Patna area of the Keonjhar district. Following are some excerpts of that article.

The world’s largest steelmaker Arcelor-Mittal has roped in M N Dastur and Company (P) Ltd (Dasturco) to prepare the detailed project report (DPR) for its proposed Rs 40,000 crore steel facility in Orissa’s Keonjhar district. …

The Arcelor-Mittal group, which signed an MoU with the state government for a greenfield steel plant in December, 2006, plans to have its DPR in place within the next 12 to 18 months, sources said.

Dasturco, a five-decade old leading engineering consultancy and design company, has well-known expertise in project planning and appraisal, economic evaluation, design and detailed engineering, project management, supervision of construction and erection and et al and this helped the company bag the deal, sources added.

Goudia Setu inaugurated in Brahmagiri in a remote part of Puri district

Assistance, Loans, Puri, Rivers and Bridges Comments Off on Goudia Setu inaugurated in Brahmagiri in a remote part of Puri district

Pioneer reports the inauguration of Goudia Setu in Brahmagir in remote part of Puri district. Following is a quote from that report.

Brahmagiri Congress MLA Laletendu Bidyadhar Mahapatra on Wednesday inaugurated the Goudia Setu under Rahadmalla panchayat. Built at a cost of about Rs 3 crore with NABARD assistance, the bridge is expected to improve the communication network in this remote part of Puri district.

Latest HRD roundup from Orissawatch.org

Angul, Anugul- Talcher - Saranga- Nalconagar, Balangir, Bhubaneswar- Cuttack- Puri, Bhubaneswar-Berhampur, Bhubaneswar-Cuttack- Kalinganagar, Bhubaneswar-Dhenkanal- Anugul, Cuttack, DISTRICTS & BLOCKS, Engineering and MCA Colleges, HRD-n-EDUCATION (details at orissalinks.com), IT, K-12, Kalahandi, KBK Plus district cluster, Khordha, Koraput, Management institutions, Marquee Institutions: existing and upcoming, Medical, nursing and pharmacy colleges, Odisha and Center, Research institutions, Rourkela- Kansbahal, Rourkela-Jharsuguda, Sambaplur- Burla- Bargarh- Chipilima, Tatas Comments Off on Latest HRD roundup from Orissawatch.org

Following is a roundup on HRD related postings at orissawatch.org.

Golden grass handicrafts from Orissa

Arts n crafts, Cottage industry and Handlooms, Handicrafts, Kendrapada, RURAL & SPECIAL PROGRAMS Comments Off on Golden grass handicrafts from Orissa

There have been several news items regarding the beauty of handicrafts made up of dried grass which becomes yellow and golden in color. Following are some excerpts on this from a report in New Kerala.

Dried grass, which becomes yellow and golden in colour, has been innovatively used by a group of Oriya women to craft attractive items of daily use.

The grass is made of Khus Khus stem. It is sturdy and can be bent to any shape to be turned into items of household use. It can also be crafted into decorative items. This has been the occupation of a group of Orissa’s Jajanga Village of Kendrapara District for the last ten years.

Nearly 80 per cent of the women in Jajanga village create various decorative items like flowers, baskets, wall-hangings, mats and pen-stands. All that each of them earn is about Rs.500 to 1,500 per month. …

The Golden grass items were introduced to Jajanga by Mahila Samiti committee headed by Swarna Prabha Swain. Today, it exists as a cottage industry here. …

At times they take five days to make an item. They take pride in their produce, and hope that the day is not far when their handicrafts are sold all over the country, or at least in all part of Orissa.

Perhaps the Orissa government can push this village to become an arts-n-crafts village like Raghurajpur and include it in a tourist circuit. In general, Orissa government should identify a few more craftsman villages where 80% of the houses are involved in some handicraft or some art-n-craft and develop amenities there  and include them in tourist circuits. Besides the above mentioned village other candidates could be a village or villages in Baragarh district that weave Sambalpuri sarees and villages near Pipli. My knowledge of such villages is rudimentary, but we will keep our eyes open and report about them here.

Khadi and Village Industries Commission (KVIC) takes two Orissa villages under the cluster village program

Arts n crafts, Khadi and Village industries, Khordha, Koraput, RURAL & SPECIAL PROGRAMS 1 Comment »

Pragativadi reports that the Khadi and Village Industries Commission (KVIC) has taken two Orissa villages under the cluster village program. These villages are Jayapur in Koraput district and Erkana in Khorda district. Following is an excerpt from that report.

... under the programme, the Commission would encourage leather and industry in Jayapur while it would boost bamboo craft in Erkana village. Stating that the Commission is providing all support to the artisans of these two villages to enable them to further sharpen their skills in their profession, she said that efforts are being taken to provide high-end technical support to these artisans. She also said that the Commission has selected 534 rural entrepreneurs to set up small scale industries. Joshi also said that KVIC has already set up 4853 small scale units in Orissa under the National Rural Employment Generation Programme while it has insured 1220 rural entrepreneurs under Janashree Bima yojana in the state.

ECOR Press Release: Fast passenger trains between Cuttack and Paradip replacing the railbuses.

Cuttack, Jagatsinghpur, Kendrapada, Paradip - Jatadhari - Kujanga, Ports and waterways, Railways Comments Off on ECOR Press Release: Fast passenger trains between Cuttack and Paradip replacing the railbuses.

Bhubaneswar, May 30, 2007

For the convenience of travelling public and keeping in view the demands of passengers, East Coast Railway has decided to run two pairs of Passenger Train between Cuttack & Paradeep from 1st June’07 replacing Rail Bus service except Sundays.

5 CP Cuttack-Paradeep Fast Passenger will leave Cuttack at 07.45a.m, Kandarpur at 08.03a.m, Raghunathpur at 08.22a.m, Gorakhnath at 08.44a.m, Rahama at 09.03a.m, Badabandha at 09.15a.m and will arrive Paradeep at 09.45a.m.

In the return direction, 6 CP Paradeep-Cuttack Fast Passenger will leave Paradeep at 10.15a.m, Badabandha at 10.31a.m, Rahama at 10.44a.m, Gorakhnath at 11.03a.m, Raghunathpur at 11.23a.m, Kandarpur at 11.43a.m and will arrive Cuttack at 12.15p.m.

Similarly, 7 CP Cuttack-Paradeep Fast Passenger will leave Cuttack at 03.00p.m, Kandarpur at 03.18p.m, Raghunathpur at 03.37p.m, Gorakhnath at 03.59p.m, Rahama at 04.19p.m, Badabandha at 04.30p.m and will arrive Paradeep at 05.00p.m.

In the return direction, 8 CP Paradeep-Cuttack Fast Passenger will leave Paradeep at 06.00p.m, Badabandha at 06.16p.m, Rahama at 06.29p.m, Gorakhnath at 06.49.m, Raghunathpur at 07.09p.m, Kandarpur at 07.29p.m and will arrive Cuttack at 08.00p.m.

Paradip port aims to be number 2

Bhubaneswar-Paradip, Jagatsinghpur, Paradeep port, Paradip - Jatadhari - Kujanga, Ports and waterways, Railways, Roads, highways and Bus stands 1 Comment »

Statesman has a report on Paradip port aiming to be the number two port in the country. Following are some excerpts from that report.

Armed with a Paradip business and strategy plan for the next 20 years and an action plan for the next seven years, Paradip Port has set on sail to become the No-2 port of the country. The charted course envisages investments to the tune of over Rs 3,500 crore and it aims at handling capacity of 106 million tones in five years. … The growth recorded was a phenomenal 15 per cent and the revenue surplus was around Rs 198 crore last year. All new berths being planned will be on PPA mode and the capacity which is 51 mt will be increased to 106 mt by 2011-12, said the chairman. He pointed out that by November this year, the single point mooring will be commissioned adding 15 mt handling capacity. This is a IOC project with a berth floating 20 km offshore and pipelines which are already in place. … Maritime trade is on the upswing and each port has set high targets but the uniqueness of Paradip is that it has handled 38.4 mt with only bulk cargo. Despite limitations of being a bulk port with 14 berths and a limitation of 12.6 metre in terms of depth of the channel, the port has handled such huge quantities. … There are plans and projects to deepen the channel upto 16 meters to accommodate 125,000 tonners. Presently, it can accommodate 75,000 tonners. The project entails investment of Rs 253 crore and is scheduled to be completed by August 2008. Simultaneously, enhancement of draught at the existing dock system from 12.5 to 14 metres has also been planned for completion by March 2008. … The port plans creation of southern dock system with an investment of Rs 530 crore and four berths. This is targeted for commercial operation by March 2012. The approaches and connectivity have also been planned in a futuristic manner with enhancement of rail connectivity Haridaspur-Paradip line slated to be over by March 2009, four-laning of Chandikhole to Paradip road by March 2008. Even relocation of the existing township has been proposed keeping in view the raid development of the port activities.

Watershed mission activities for landless families and other such plans

Coffee development, Countering drought, KBK Plus district cluster, Koraput, Rayagada, River Valley Project, RURAL & SPECIAL PROGRAMS, TRIBAL WELFARE, Watersheds 1 Comment »

New Indian Express reports on some of these plans. Following are some excerpts from that report.

The State Government has decided to prepare a five year plan to expand the activities of the Watershed Mission to benefit six lakh landless families.

Official sources said that the activities of the Mission would be intensified in areas inhabited by tribals of the Juang community to create employment opportunities.

Mission activities include digging of ponds to meet the water requirement in the villages and promotion of dairy and horticulture. …

Other projects undertaken under the Mission include the Integrated Watershed Development Project (IWDP), a centrally sponsored programme implemented in 23 districts. The outlay of the project has been fixed at Rs 148.07 crore for 2.78 lakh hectare.

The Drought Prone Area Programme (DPAP), another centrally sponsored scheme is being implemented in eight districts covering 47 identified drought prone blocks.

Sources said that 800 micro watershed projects have already been executed while another 600 are being implemented. The total expenditure has been pegged at Rs 227.4 crore .

Besides, 314 micro watershed projects have been taken up by the Mission in the KBK districts for treatment of 1.67 hectare with an expenditure of Rs 100.57 crore.

Coffee Development Programme (CDP) for small growers has also been taken up under the Mission in Koraput and Rayagada districts.

The programme aims at providing sustainable livelihood to tribal farmers. In the first phase, coffee cultivation was taken up in 2,000 hectares, 1,000 hectares each in the two districts. In the second phase, the programme would be implemented in more than 8,000 hectares with Rs 67.21 crore.

The River Valley Project (RVP) is being implemented in the catchment of inter-state projects, Hirakud, Machhkund- Sileru, Rengali-Mandira and Upper Kolab dam projects to prevent land degradation and prevent silt inflow. The expenditure has been pegged at Rs 4.97 crore.

Chandaka sanctuary inside Bhubaneswar metro – comparison with Mumbai’s Sanjay Gandhi national park

Bhubaneswar- Cuttack- Puri, Chandaka, Khordha 1 Comment »

The planned Bhubaneswar-Cuttack-Choudwar metroplex will have a ring road with NH-5 consisting one part of it with the other part to be constructed. The other part will start from south of Khurda and go through Haladia, Athagarh and Nergundi (a bit south of Tangi). A detailed map of this new road is here. Inside this proposed metroplex will be the Chadaka-Dampara sanctuary. Below I give maps of Bhubaneswar area and Mumbai area to show the relative size of the Chandaka-Dampara sanctuary and the Sanjay Gandhi National Park that is part of the Mumbai metroplex. Both maps have the same resolution. Recently, there is plan to popularize the Chandaka-Dampara sanctuary among the local people. Following is an excerpt from a report in the New Indian Express.

According to divisional forest officer (DFO) and wildlife warden Akshaya Kumar Pattnaik, there are plans to popularise the various spots of the sanctuary among the nature lovers as many in the Twin City are still not aware.

The nice bamboo hut and watch tower near Deras Dam with one and two suites available respectively overlook the channels and drainage system of the water source which provides lifeline to the Mendhasal agriculture farm.

The Kumar Khunti and Ambilo watch towers also have got accommodation facility.

“Plans are on to have small wooden restsheds to accommodate the nature lovers who will come on bicycle rides and can stay overnight as practised in in the West and some well managed reserves in several parts of the country,” Pattnaik reveals.

A visitor can also have the panoramic view of Mahanadi from Mantu Hill Top and enjoy the small fall near Godabhanga Tangara in the rainy season. The caves below the fall are home to hyaenas, he adds.

Apart from wildlife, the ancient forts at Bualigarh and Chudanga can be explored which have great archaeological value, the DFO says adding an interpretation centre is on cards with a fodder demonstration centre, small herbal garden, souvenir stall and snacks parlour at Godibari entrance of the sanctuary.

Though more than 10,000 visitors visit in a year, the DFO feels the number should go up considering the charm of the jungles, especially when one can enjoy the coastal sal range from Kochila Berena watch tower.


Mumbai

Raghurajpur as a model arts village of the country to be replicated in five other locations

Arts n crafts, Arts village, Odisha Culture, Puri, TOURISM, ENTERTAINMENT and SHOPPING 1 Comment »

Several news reports mention that the Ministry of Tourism of India has been very impressed by the evolution of Raghurajpur village of Puri district as an arts village. There every house has become an art gallery. So impressed the ministry of tourism is with the village, it plans to replicate it in five other locations of the country. Following is an excerpt from Chennaionline.

What started as promotion of ‘pattachitra’ (painting on palm leaf) in Raghurajpur village in Puri district as part of rural tourism project five years ago culminated into transformation of the village into a vibrant centre of folk art.

In 2002, only about 6,000 tourists visited the place. In 2005, the tourist arrival figure went up to 34,000. The sale from the art and craft work went up from Rs 15 lakh to Rs 52 lakh during the same period.

Stone craft, pattachitra, palm leaf inscription, papier mache, sodhai work, mural painting, golden grass coir, screwpine leaf and wood work, filigree, applique, terra cotta and bell metal work greet visitors whose number is increasing every year.

“Every house in this village is an art gallery,” said a senior ministry official.

“The village has served us not just as a role model for generating employment through rural tourism but also as an inspiration for how to preserve folk art,” the official said.

Besides Raghurajpur, the other villages identified for setting up gurukul tradition of teaching art are Pochampalli in Nalgonda district in Andhra Pradesh, Hodka in Kachch district in Gujarat, Pranpur in Ashok Nagar district in Madhya Pradesh and Aranmula in Pathanamthitta district in Kerala.

POSCO-INDIA’s brochure highlighting the NCAER study

Bhubaneswar-Paradip, Jagatsinghpur, Paradip - Jatadhari - Kujanga, Ports and waterways, POSCO, Railways, Roads, highways and Bus stands, Steel Comments Off on POSCO-INDIA’s brochure highlighting the NCAER study

I came across several leaflets and brochures in POSCO-INDIA’s Press room pages. Following is the brochure that highlights the NCAER study that I mentioned earlier.

Economic Effects of POSCO-India : A study by NCAER

Bhubaneswar-Paradip, Budget, State, INDUSTRY and INFRASTRUCTURE, INVESTMENTS and INVESTMENT PLANS, Iron Ore, Jagatsinghpur, MINES and MINERALS, Mining royalty, Paradip - Jatadhari - Kujanga, POSCO, PPP, SEZs, Steel, Taxes 1 Comment »

I came across a 1-page note someone from POSCO-India gave me when I was visiting Bhubaneswar in December 2006-Jan 2007. The 1-page note summarizes a study done by NCAER. The study has also been reported in News media such as Hindu Businessline. (POSCO-India in its web page has additional links.) We will give some excerpts from the Hindu Businessline report.

The 1-page note: POSCO-India’s rs 52,810 Cr investment by 2016 will stimulate Orissa Economy.

  • Economic Benefit:
    • Generate Rs 29,760 crores additional annual gross output for Orissa including Rs 12,610 Crore of POSCO-India’s direct gross output.
    • Create excess annual value addition of Rs. 12,100 crores for Orissa which equals 19% of Orissa’s state GDP in 2005-06 (equals 11.5% in 2016-17)
  • Employment:
    • Job creation of 870,000 man years, absorbs 88% of state unemployment backlog (i.e., decrease in backlog of employment from 9.9 lakhs in 2005-06 to 1.2 lakhs).
    • 18,000 man years of direct employment in POSCO-India.
  • Tax Contribution:
    • POSCO-India annual tax contribution (Rs 2,620 Crores) would be appx. 17.6% of total tax revenue of Govt. of Orissa in 2016-17.
    • POSCO-India SEZ would contribute Rs 174,970 crore tax revenue in next 35 years.
      • Rs 77,870 crores would be to Govt. of Orissa and Rs 97,100 crores to Govt. of India.
      • The differences of tax between SEZ and DTA status is less than 8% for Govt. of Orissa and 5% for Govt. of India.
  • Comparison with current Orissa Economy:
    • Orissa in 2003-04:
      • Gross Output: 111,378 crores
      • State GDP: 53,830 crores
      • Employment: 143 lakhs (2001 census)
      • Tax: 8170 crores (2005-06)
    • POSCO-India’s impact:
      • Gross Output: 29,760 crores
      • State GDP: 12,100 crores
      • Employment: 8.7 lakhs
      • Tax: 2620 crores

We now give some excerpts from the Hindu Business line article of January 2007 which partly explains how some of the above numbers were calculated. That article was written by R. Venkatesan who works for NCAER, but the article was his personal view.

The NCAER study broadly used the ADB/World Bank methodology on the social cost-benefit with minor adjustments for the local parameters. Econometric models were used to project border prices for the useful life of the project. The project’s impact from the State economy perspective — in terms of the impact on the State GDP (output multiplier effects) and employment opportunities created within the State (employment multiplier effects) was also assessed.

The output multiplier for iron ore was found to be 1.4 compared to 2.36 for steel. In other words, every Rs 1 lakh worth of output in the iron ore sector would result in Rs 1.4 lakh of output (including the Rs 1 lakh output of iron ore) compared to Rs 2.36 lakh for every Rs 1 lakh output of steel. The employment multipliers for iron ore and steel work out to 0.35 and 0.69 man-years respectively. Therefore, in terms of both output and employment, steel has a larger impact.

These multipliers imply that the Posco project would create an additional employment of 50,000 person years annually for the next 30 years vis-à-vis 870,000 person years in the steel project alternative. In terms of value addition, the iron ore and steel project alternatives would contribute 1.3 per cent and 11.5 per cent to Orissa’s State Gross Domestic Product (or SGDP) by 2016-17 respectively.

An important part of the study was the Least Cost Analysis of technology options in the steel-making, the Finex process that Posco purports to bring and the traditional blast-furnace technology. The Average Incremental Economic Cost was used as the yardstick; this was followed by computing the economic IRR (internal rate of return)
to examine whether the project was economically worthwhile from the national economy point of view.

The EIRR for the Orissa project works out to 16.6 per cent for base case and even in the worst case scenario, the EIRR at 13.9 per cent would remain above the hurdle rate of 12 per cent. The economic impact of the project was estimated at $2.5 billion at the test discount rate of 12 per cent.

The significant feature of the study was the estimation of depletion premium or the opportunity cost for depleteable and non-renewable resource iron ore for reasons cited below:

India’s high-grade ore (+ 65 per cent Fe content — Haematite) reserves, proven and probable, amount to only 0.58 billion tonnes. And even if we were to factor in indicative and inferred reserves (probable/feasible), the total reserves (proven and possibly future potential) would be only 0.92 billion tonnes.

India’s medium-grade ore (+62 per cent Fe to 65 per cent Fe — Haematite) reserves, proven and probable, is only 1.3 billion tonnes. Here too, if we factor in indicative and inferred (probable/feasible and pre-feasibility estimated) reserves, the total reserves (proven and possibly future potential) will be only 2.8 billion tonnes.

Policy Implications

Orissa stands to gain significantly if instead of exporting iron ore it processes it to steel within the State, in terms of both employment generation (17 times), and GDP impact (9 times).

India’s high and medium grade iron ore reserves may not last more than 19 years even if exports of these grades are frozen at the current level or if the targets set out in the draft steel policy are to be met. The economic analysis considered the depletion premium for high and medium grade iron ore. This is the opportunity cost to the national economy of using the depletable resource, which is the average incremental cost of depletion premiums computed year-wise.

Any exporter of iron ore of medium and high grades from the State needs to pay a depletion premium of $27 per tonne. Even this would be a sub-optimal policy from the State’s viewpoint if it can process the medium and high grade ore to steel. No such depletion premium has been applied for coking coal as its price did not exhibit any
trend before the recent steep price hike.

For the eastern States seeking to raise the mineral sector’s share in their GDP, it may be a good idea to set up processing facilities. It would not be advisable to allocate iron ore mines through open bids or accept increased royalty payments, even accounting for the depletion premium, compared to the option of processing iron ore to steel. Future cost-competitiveness and logistical advantage imply that iron ore-rich States can compete with existing over-capacities in the US, Europe and Japan even after factoring in the capital charges for new investments.

Export of iron ore needs to be restricted to grades other than medium and high-grade ore categories; for instance, export of beneficiated ore from Goa using inland waterways logistics advantages could be encouraged. Allowing exports of high grade ore would facilitate export of steel from existing over-capacities in the US, Europe and Japan to East Asia at the expense of future steel exports from new Indian steel capacities which are likely to enjoy cost-competitiveness over existing over-capacities elsewhere.

I am not qualified to judge the above analysis. I would appreciate any comments, analysis, criticisms etc. on the above.

15 kms of four lane road in Kalinga nagar connecting Jajpur Rd with Duburi.

Budget, State, Jajpur, Jajpur Rd- Vyasanagar- Duburi- Kalinganagar, PPP, Roads, highways and Bus stands, Steel Comments Off on 15 kms of four lane road in Kalinga nagar connecting Jajpur Rd with Duburi.

Pioneer reports that the Orissa government has decided to build a 4 lane road from Jajpur Road to Duburi in the Kalinganagar area. Following are excerpts from the Pioneer report.

The Government will construct a four-lane road connecting Chorada Square of Jajpur Road with Dubri in Kalinga Nagar as an alternative to National Highway-200, following the increase in vehicular traffic and resulting congestion on the NH-200 connecting Duburi and Chandikhole in Jajpur district. …

A sum of Rs 43 crore has been provisioned by the Government in the Budget, while the remaining amount of Rs 47 crore of the total of Rs 90 crore required for the project will be sourced from the owners of mines and industries.

Giving the details, the Finance Minister said the 15-km-long road would connect NH-200 with NH-215 and Rs 13 crore would be spent for acquiring the land required. The work on the project would commence soon, with the target of completion of land acquisition being set for September 15, he added. …

According to the plan, half of the road, i.e. 7.5 km, would be completed in the first phase and the Public Works Department (PWD) has been asked to call for tenders.

The tender notice will be published within a fortnight. The entire project will be completed by 2008.

From natural resources to human resources – a first formalized step?

HRD-n-EDUCATION (details at orissalinks.com), INDUSTRY and INFRASTRUCTURE, L & T, Rayagada, Rayagada- Therubali Comments Off on From natural resources to human resources – a first formalized step?

Today’s Business Standard reports that all future MOUs signed by the Orissa government will have more conditions related to value addition, employment infrastructure and ancillary development. Following are some excerpts from that article.

The Orissa government has decided to incorporate new conditions in all MoUs to be signed henceforth with investors proposing to set up projects in the state, to compel them deliver more on value addition, employment, infrastructure and ancillary development front.

At a meeting today, L&T officials made a presentation regarding plans on investment in Orissa and the benefits to flow to the state. According to sources, the company has agreed to upgrade the existing plant of L&T plant located at Kanspal near Rourkela in Sundergarh districts where high end engineering products will be manufactured.
Similarly, it has been asked to set up a technical institution closer to the refinery site and develop a greenfield plant. The company will also be involved in the infrastructure development.

For this, the company has been asked to participate in the Special Purpose Vehicle (SPV) for Therubali-Gunupur Rail Link. Further, in order to promote employment in the state the company will be asked to develop downstream industries, he added. It may be noted, the details of the MOU conditions will be worked out within next 2-3
days before formal signing of the MOU.

This changed attitude of the government to extract certain commitments from the industry in MoUs to safeguard the state’s interest is likely to be reflected in the signing of the Memorandum of Understanding (MOU) for the L&T-Dubal project, a joint venture between L & T of India and Dubal Aluminium of Dubai.

This is a good first step; especially the part regarding establishment of “technical institute.” However, it is not clear what kind of technical institute is referred to: an ITI, a polytechnic, or a degree engineering college. The government should insist on all three. As a reference point Jharkhand has convinced Central Coalfields to set up an engineering college in Jharkhand, and Bokaro Steel Plant to set up an engineering college and a medical college in Jharkhand.

Orissa must follow Jharkhand’s example. It should not only require a medical college and an engineering institution (with degree college, polytechnic and many ITIs as part of it) from the new companies but also require it from existing companies; both public and private ones. The existing companies which do not agree to this should be blacklisted and not given any preferred treatment for various things such as permissions, renewals, expansions etc. To discourage them from delaying, an escalation formula should be worked out so that the more the company delays the more it has to put in later.

Training and employment in medical transcription

Bhubaneswar- Cuttack- Puri, IT, Back office, BPO, Khordha 6 Comments »

New Indian Express reports Vasant Scribes coming to Bhubaneswar to provide training and employment opportunities. Following are excerpts from that report.

Leading medical transcription company in India, Vasant Scribes is set to provide training to the unemployed youth of the State to join the field even as it has commenced commercial operations from its Bhubaneswar facility at STPI here.
The company which, at present, has 35 medical transcriptionists intends to expand the facility to over 300 within one and half years. And the bulk of the staffers would be the youths who successfully complete the training.

… The company has applied for one acre of land in the Infocity and has submitted the building plans and layout to the Government.

… But in a stark departure from prevailing practices, the training would not only be imparted free of cost but the trainees would also be given a handsome stipend.
Eligibility would be Plus II pass, preferably with a science background.

… Headquartered at Hyderabad, the company employs over 500 personnel in the city.

Rs 20,000 cr Alumina plant to be set up in Rayagada

Aluminium, INDUSTRY and INFRASTRUCTURE, KBK Plus district cluster, Rayagada Comments Off on Rs 20,000 cr Alumina plant to be set up in Rayagada

The Pioneer reported,

“Another Alumina plant is in the offing. L&T and Dubai-based Dubal Company will set up an Alumina plant at a cost of Rs 20,000 crore at Kushumshila in Rayagada.

Representatives of both the companies met the Chief Secretary Ajit Tripathy on Monday and held a detailed discussion. at the State Secretariat.”

Financial Express has more details on the proposed alumina plant.

Land prices and R & R: exploiting poor people? government incompetence? etc.

Bhubaneswar-Paradip, INDUSTRY and INFRASTRUCTURE, INVESTMENTS and INVESTMENT PLANS, Jagatsinghpur, Paradip - Jatadhari - Kujanga, R & R Comments Off on Land prices and R & R: exploiting poor people? government incompetence? etc.

Often many well-meaning people read about a particular R & R package for one location in one state and then compare it with R & R package and/or land prices offered in another state, in our case Orissa, and start making wild allegations that the Orissa government is incompetent in getting a good deal for its people or the company or foundation that wants to set up something is evil etc. etc. To make the obvious point, obvious to anyone who thinks rather than is driven by his/her preconceived ideology, that land prices vary across different locations in India, following are some data points.

(i) Hindu and Pioneer report about the Brahmani steel plant coming up in Jammalamadugu in Andhra Pradesh. There the Andhra Pradesh government has procured land at Rs 18,500 per acre for the steel plant which will need 10,640 acres. The government has also promised allotment of 3000-4000 acres for an airport at the price of Rs 9,000 per acre. The exact quotes from Pioneer are as follows.

The plant, to come up on an area of 10,640 acres, will be the second biggest plant after the Visakhapatnam steel plant making Andhra Pradesh the biggest steel producing State in the country. …

The Chief Minister denied any favouritism in providing land to the project and said that prices higher than market price was paid for the land. “The land has been purchased at the rate of Rs 18,500 per acre which is the highest in the district,” he said.

The quote from Hindu is as follows:

Announcing that BIL Managing Director Janardhana Reddy, an MLC in Karnataka, had agreed to construct a commercial airport nearby, he promised allotment of 3,000 to 4,000 acres of land at Rs. 9,000 per acre, half the price charged for land given to the steel plant.

(ii) On the other end of the spectrum following is an excerpt from Moneycontrol on land prices and compensation offered for land in Dankuni near Kolkata.

Construction giant DLF has offered to pay a whopping 55 lakh rupees an acre for acquiring close to 5,000 acres near Kolkata.

Never before has any company paid so much. Even the government paid up to 14 lakh rupees an acre in Singur, which is 20 kilometers away. DLF proposes to build an integrated township and a 100-acre SEZ. And the rehabilitation package it has promised, is awesome – guaranteed employment, alternative housing, education and even healthcare facilities for displaced farmers.

So what is our point? and Why is it relevant to Orissa’s growth and infrastructure development?

There are several land acquisitions going on in Orissa with respect to industries (POSCO, Tatas etc.), for Vedanta University, for various rail and road projects, etc. So when you come across a price or compensation package in another state and it does not gel with some other packages in Orissa that you have read about, please investigate more before getting all riled up and accusing the Orissa govt., its ministers, its bureaucrats, or the companies. They may as well be at fault, but please do research before deciding on it and shooting off emails or postings, as the above data points make it clear that land prices vary quite a lot among different locations in India.

Another point we want to make is that, Orissa has to balance between getting the best deal for its people (beyond the market price) and losing the project to another state. Again, the data point shows that there are other states who can offer very cheap land price and if Orissa asks too much (beyond the market price) then there is a real risk of losing the project. In case of steel and aluminium project, losing the project and consequently delaying in allotting certain mines may also mean that the mines may be allocated by the central govt to out of state companies. As a result Orissa will lose out on the value addition and on the infrastructure (such as roads, railway links, ports, townships, etc.) that are associated with large steel and aluminum plants.

A suggested approach to get the best deal for people (beyond the market price) losing their land is to have a central R & R policy that every state must follow, so that they don’t compete on the basis of who can offer the cheapest (relative to the market price of that particular location) land price and R & R. This can also be achieved if the relevant states (Orissa, Chhatisgrah, Jharkhand, etc.) agree on a common policy. (Sandip Dasverma, a friend, has often mentioned the later.)

[Acknowledgments: Deba Nayak of ornet for pointing to the Pioneer article in ornet. Participants of Orissa Today google group for engaging in multiple debates on this issue.]

30 Infrastructure projects with PPP funding in Orissa

Angul, Bhubaneswar- Cuttack- Puri, Bhubaneswar-Paradip, Dhenkanal, Jagatsinghpur, Jajpur, Jharsuguda-Sambalpur- Bargarh, Khordha, PPP, Railways, Rayagada, Roads, highways and Bus stands, Rourkela-Jharsuguda, Sambalpur, SEZs, Sundergarh 3 Comments »

Business Standard in an article in April listed several infrastructure related projects that Orissa is planning using PPP. Following are excerpts from that article.

… the Orissa government has lined up 18 new projects in the Public Private Partnership (PPP) mode entailing an investment of over Rs 6000 crore.

Of the 18 projects, 12, mostly large and medium, have already been consolidated with investments of Rs 3500 crore.

Another six projects, fairly bigger in respect to the previous ones, are under active consideration and would cover an investment of around Rs 2500 crore, according to government sources.

Source said, till date, an around Rs 5300 crore investments have already been lined up and are under implementation in the PPP module in 12 odd projects across the state.

In all the Orissa government plans to develop 30 odd projects in different sectors in the PPP module over the next two years covering an investment of over Rs 11,300 crore. …

The PPP modules currently under implementation and those under consideration cover a wide range of activities starting from port cuilding, railway line construction, road development and erection of urban clusters. …

The new projects being considered under the PPP module included development of road links in the Capital Region Ring Road, the Bhubaneswar-Paradip Road, the Suakati-Dubuna Road and the Tensa-Barsuan-Lahunipada Road.

These would entail a primary investment of Rs 1547 crore for the development of 279 kilometres of road, including a four-laning of the first one.

Other than this there would World Bank identified projects where four laning would be done of the Sambalpur-Rourkela road from the existing two-lane road.

The long pending Joda-Bamebari Road and Koira-Rajamunda Road covering 229 kilometres would also be taken up.

The PPP module would be used for two vital rail links. The first was the Angul-Duburi-Sukinda rail link and the second the Gunupur-Theruvali link. In both cases, the Special Purpose Vehicle ( SPV) route was being proposed. The investment for the rail links was estimated to be in the region of Rs 570 crore. The Angul-Sukinda rail link would be of 90 kilometres and the Gunupur-Theruvali link would be 79 kilometres.

PPP’s for setting up Bio-tech parks, SEZ for IT/ITES companies and integrated commercial and residential complex, an enclave at Shahidnagar are were also part of the city building endeavour of the Orissa government.

This apart, a commercial shopping complex and an A.C.Market complex at Unit IV are also being contemplated in the PPP mode as part of city development plan.

Till date, investment for the SEZ for IT/ITES companies had been identified and were estimated to be in the region of Rs 35.67 crore. As for the other residential and commercial complexes, project details and cost were being worked out on a war footing.

Coupled with these, a multi-product SEZ at Paradeep had been suggested by the government for development using the PPP route. It was expected to entail an investment of Rs 712 crore.

Land of around 1093 hectares would be needed for the SEZ in the Marshagahi Tehsil of Kendrapara under Paradeep.

This article is probably based on a presentation available from the Orissa govt. website. That file seems to be corrupt but its google cache shows part of the information.

Reader Martand Deo: Khurda Rd – Bolangir New Broad Gauge Line – Why it Can’t be made like Hasan- Mangalore Rail Line.

Balangir, Bouda, Kandhamala, KBK Plus district cluster, Khordha, Nayagarha, Railways 1 Comment »

Reader Martand Deo suggests that there should be attempt to build the Khurda-Balangir line through PPP similar to the way the Hasan- Mangalore Rail Line is being built. His points are:

1. With the active initiative of Karnatak State Governament Hassan Mangalore Rail Development Company Limited (HSMDC) is formulated, along with this New Mangalore Port and Mineral Enterprise Limited, K-RIDE joins the hand to move this project forward, with the stake as follows

a. Government of Karnataka 40%
b. Ministry of Railways 40%
c New Mangalore Port Trust 9%
d. Mineral Enterprises Limited 9%
e. K-RIDE 2%

2. To have a better representation and smoother functionality HRMDC comes up with one Chief Executive Officer and assisted by Professional Board of directors from Government of Karnataka, Ministry of Railways, participant companies and other users of that
region .

3. This Rail Line also have greater challenges, which crosses Western Ghats passes through 55 kms of ghat section, on construction activities, train operations and maintenance of the
line, but a greater will power of karanatak finally made it.

4. Govt. Of Orissa is spending a lot in the name of KBK development, if it Could allocate some fund for this rail line, the development can be much more than the current trend, As the recent World Bank Survey says if one rupee is invested in terms of road, Rail infrastructure development, poverty elimination can be done 7 times better than others.

5. For details how Hasan- Mangalore rail line project is implemented, the following web Site can be visited. http://www.hmrdc.com/

I do not know about Karnataka, but the government of Orissa is involved in several Railway line construction through PPP. The two that are approved and underway are Haridaspur-Paradip and Angul-Sukinda. Then in their priority would be Gunupur-Theruvali (for shorter access to Gopalpur port), Bhadrakh-Dhamara (being built by DPCL), Gopalpur port connectivity and Vedanta University connectivity; followed by any other port connectivity for any other port that gets built such as Kirtania, Astarnga etc. Regardless, some way has to be figured out to get Khurda-Balangir connectivity done as soon as possible. A Business standard article in April lists some of the PPP driven plans of Orissa government.

 

Pentasoft plans a multiplex in Bhubaneswar

Bhubaneswar- Cuttack- Puri, Khordha, Malls, Multiplexes 3 Comments »

Economic Times reports that Pentasoft plans a multiplex in Bhubaneswar and other cities. Following is an excerpt from that report.

As part of its expansion plans, the company has chosen Coimbatore, Hyderabad, Bhubaneswar and Mysore for the projects, which would have resorts, theme parks, children games and go-carting, Pentasoft CEO Hariharan told reporters here.

The multiplexes would be ‘replicas’ of the one in Chennai, ‘Mayajal’, he said.

A review of Mayajal in Chennai is at this site.

More Hilton brand hotels in Bhubaneswar

Bhubaneswar- Cuttack- Puri, Hotels and resorts, Khordha 2 Comments »

Deepikaglobal reports that Hilton plans to open a Hilton Hotel and a Homewood Suites in Bhubaneswar. Bhubaneswar already has a Trident Hilton. Following is an excerpt from that report.

Speaking to mediapersons here today, DLF Home Developers Ltd Chief Financial Officer Surojit (Babu) Basak said, ”We plan to open two hotels under Hilton brands–Hilton Garden Inn, amid market segment hotel, and Homewood Suites, which are service apartments, entailing an investment of around Rs 500 crore. The hotels would have 600 rooms altogether. … The hotels would be operational in three years, he added.

The US-based Hilton Hotels is looking at ten-fold increase in the number of hotel property in India. Hilton Hotels would also open hotels in Delhi, Mysore, Bhubaneswar, Bangalore, Hyderabad, Goa and Kolkata. Homewood Suites, the longstay brand in Hilton’s portfolio, would debut at Kolkata, Bhubaneswar and Hyderabad.

Progress on the Ranchi-Vijaywada highway zig-zagging through 1219 kms of Orissa

Angul, Balangir, Bouda, BRGF: Backward districts program, Central grants, Deogarh, Extremist infested districts program, Gajapati, Ganjam, Kandhamala, KBK Plus district cluster, Keonjhar, Koraput, Malkangiri, Mayurbhanj, Rayagada, Sambalpur, Sonepur, Uncategorized, Vijaywada-Ranchi highway 2 Comments »

Anubhuti Bishnoi in Indian Express reports on the progress towards making a 2-lane Ranchi-Vijaywada highway zig-zagging through 1219 kms of Orissa and passing though most of its tribal districts, many of which are naxalite infested. The article has a nice map showing which towns the road will pass through in Orissa. Following are some excerpts from that article. (Thanks to Manoj Sahu in Africa for mentioning this article in Agami Orissa.)

At a recent meeting chaired by Prime Minister Manmohan Singh, the Ministry of Shipping, Road Transport and Highways was asked to expedite finalisation of the Detailed Project Report (DPR) for the Vijayawada-Ranchi corridor cutting through Orissa, and take it up on a priority basis. … Around 1,219 km of the 1,729-km corridor planned between Vijayawada and Ranchi will fall in Orissa, and the state government had requested that its state highways, district and rural roads be incorporated in the corridor. Now 235.8 km of national highway sections, 878 km of state high ways and 104.5 km of rural roads will be a part of the corridor. The road from Vijayawada enters Orissa at Motu in Malkangiri district and leaves at Tiring in Mayurbhanj district on the north. … While the Ministry may not call the stretch NH as yet, with the Prime Minister taking a keen interest, it is set to be developed as per national highway standards. What that means is that tribal areas of Koraput, Malkangiri, Rayagada, Gajapati, Ganjam, Kandhamal, Anugul, Sambalpur, Deograh, Keonjhar, Mayurbhanj and Boudh, currently insurgency hotbeds, may emerge out of the hinterlands. Confirming that the project had been put on the fast track, a senior Ministry of Shipping, Road Transport and Highways official said: “The DPR of the corridor is underway and should be ready in six-seven months.”

Note: As mentioned by Digambara a map of the route is at http://tathya.in/story.asp?sno=592. I removed the faulty map that Indian Express printed.

The Bhubaneswar metropolitan area and its lungs

Bhubaneswar- Cuttack- Puri, Bhubaneswar-Berhampur, Cuttack, Khordha, National Parks and Sanctuaries, TOURISM, ENTERTAINMENT and SHOPPING, Uncategorized 2 Comments »

Many may not know that to the west of Bhubaneswar lies the Chandaka widlife sanctuary with varieties of flora and fauna. This sanctuary is considered as the lungs of Bhubaneswar. Today’s New Indian Express has an article about this. Following are some excerpts.

The sanctuary is perhaps among the few in the country which boasts of a treasure trove of flora and fauna excepting the royal Bengal tiger. The coastal range of sal forests also end here with an intimate mix of evergreen and deciduous elements.

According to divisional forest officer (DFO) Akshaya Kumar Pattanaik, though elephant is the flagship species, two types of monkeys, three deer species and three other herbivores, nine types of carnivores including the panther, two types of civets, tree shrew and pangolins are spotted.

Also the sanctuary is home to 21 types of snakes, 16 lizards, one species of turtle and marsh crocodile. The avian types include 174 with 10 species of water fowl and waders, seven ground nesters, seven raptors and 17 song birds.

The elephant population (65 in 2006 census) is seen in group sizes of 18, 13, 8, 7, 5 and 4. Even joining of three or four family groups were also observed aggregating to a herd size of 38 at Bharatpur in the past.

Orissa tourism has a nice page on Chandaka. Following is a map of Chandaka from that site.