Archive for the 'SER' Category

Two Orissa-West Bengal MPs plan to jointly push for Jaleswar-Digha Railway line: Samaja

Balasore, Odisha MPs, Railway network in Odisha, SER Comments Off on Two Orissa-West Bengal MPs plan to jointly push for Jaleswar-Digha Railway line: Samaja

Balasore alloys pledges 45 crores for Balasore-Balgopalpur rail: Samaja

Balasore, Balasore- Chandipur, PPP, Samaja (in Odia), SER Comments Off on Balasore alloys pledges 45 crores for Balasore-Balgopalpur rail: Samaja

Little progress on Lalu’s promises on the Rupsa-Baripada-Bangiriposi line: Samaja

Baripada - Bangiriposi (under constr.), Baripada- Bangiriposi- Similipal foothills, Mayurbhanj, Railway network in Odisha, Samaja (in Odia) Comments Off on Little progress on Lalu’s promises on the Rupsa-Baripada-Bangiriposi line: Samaja

Soro demands and gets some additional railway facilities

Balasore, Bhadrakh-Balasore, KGP...Lakshannath Rd - Bhadrakh, Railways, Samaja (in Odia) Comments Off on Soro demands and gets some additional railway facilities

Orissa to fall drastically behind in Rail density

Angul - Talcher - Sukinda (under constr.), Baripada - Bangiriposi (under constr.), Bhadrakh - Dhamara (port conn. planned), ECOR, Haridaspur - Paradeep (under constr.), Khurda Rd - Balangir (under constr.), Lanjigarh Rd - Junagarh, Naupada - Gunupur (Gauge conversion), Railways, SER, Talcher - Bimlagarh (under constr.) Comments Off on Orissa to fall drastically behind in Rail density

The following is from the PIB http://pib.nic.in/release/release.asp?relid=33421. (Based on this Orissa will fall behind quite a bit: Only 2000kms of new lines
 none of the major new lines in Orissa, such as Khurda-Balangir, will get completed during the 11th plan. The states where the freight corridor will run and the states with a lot of narrow gauge lines will surge forward.)

In order to carry additional freight and passenger traffic in future, Railways have on hand 272 track capacity works, which on completion would add 20,852 kilometers to the Broad Gauge system.  The estimated throwforward cost of these works is approximately Rs. 55,000 crore.

 

A substantial amount of traffic moves on the High density routes viz. the ones which connect the four metropolitan cities of Delhi, Mumbai, Chennai, Kolkatta, and the Delhi – Gaulhati route.  Railways have already announced construction of two Dedicated Freight Corridors between JNPT-Tughlakabad (1483 kms) and Sonenagar-Ludhiana, (to be later extended to the deep sea port of Kolkatta) (1279 kms) at a cost of more than Rs. 28,000 crores to give relief to two of the densely saturated routes viz. Delhi-Mumbai and Delhi-Kolkata routes.  In addition, feasibility studies have been ordered on four other corridors – (i) North – South (Delhi-Chennai); (ii) East – West (MumbairKolkotta); (iii) South – East (VijayawadaKharagpur ) and (iv) South – South (Chennai – Goa).

In addition, Railway proposes to augment its track capacity in XI Plan by 15,500 kilometers, including 2000 kilometer of new lines, 3500 kilometers of doubling and 10,000 kilometers of gauge conversion.

The revenue earning freight traffic in the XI Five Year Plan period is expected to increase from 728 million tonnes in 2006-07 to 1100 million tonnes in 2011-12.  The corresponding freight output is expected to increase from 475 billion ton kilometers in 2006-07 (prov.) to 707 billion ton kilometers in 2011-12.  In order to cater to the projected freight traffic, it is expected that 62000 wagons would be required during the XI Plan.  Railways will also require to induct 1800 electric and 1800 diesel locomotives for carrying the projected traffic in the XI plan.  In addition to enhance the capacity of the existing diesel and electric locomotive manufacturing units, Railways are also going in for setting up a diesel locomotive factory at Marhowra and electric loco factory at Madhepura which will produce 150 and 120 locos per year respectively.

Since capacity augmentation takes time, Railways have taken immediate steps to enhance the throughput by increasing the carrying capacity of wagons by 6 tonnes on most of the routes and by 8 tonnes on selected routes and also strengthen the track, bridges and allied structures.  In addition, 28 heavy mineral routes with over 6900 route kilometers have been further identified for implementation of 25 tonne Axle load.  Also on selected routes, double stack containers trains have been permitted to further enhance the throughput per train.

Railways also plan to induct wagons of better design, higher capacity, longer life and low on maintenance.

The passenger traffic in the XI Five Year Plan is expected to increase from 6242 million passengers in 2006-07 (RE) to 8400 million in 2011-12.  The correspondence passenger output is expected to increase from 700 billion passenger kilometers to 880 billion passenger kilometers.

In order to cater to this increase in traffic, it is expected that 22500 coaches would be required  during the XI Five Year Plan,  implying a yearly requirement of 4500 coaches.  In order to meet this requirement , the production capacities of the existing units –integral Coach Factory, Prembur  and Rail Coach Factory, Kapurthanla – are being enhanced to 1500 and 1400 coaches per annum respectively from the  present capacity of 1000 coaches per annum each.  Further, a new coach factory is also being planned to be set up at Rai Bareily to bridge the shortfall in requirement and production capacities.

 

Railways have constructed a total of 4084 kilometers of track in the last three years.  The details are as under :

 

Category

New Lines

Doubling

Gauge Conversion

Total

2004-05

150

779

282

1211

2005-06

180

744

231

1155

2006-07

250

1082

386

1718

Total

580

2605

899

4084

 

This information was given by the Minister of State for Railways Shri R.Velu in written reply to a question in the Lok  Sabha today.

Samaja op-ed on India Railways neglecting Orissa

ECOR, Railways, SER Comments Off on Samaja op-ed on India Railways neglecting Orissa

Pioneer on Railways’ apathy towards Orissa

ECOR, Odisha Assembly, Odisha MLAs, Railway network in Odisha, Railways, SER Comments Off on Pioneer on Railways’ apathy towards Orissa

Following is the Pioneer report on this.

The Centre’s stepmotherly attitude towards the cause of Orissa is clearly evident in the railway sector. While the State contributes significantly to the revenue of Railways, the railway route length spread across Orissa is a mere 2,495 km with an average of 15.03 km per 1,000 square km as against the national average of 19 km and much less than the average in the contiguous States.

During 2003-2004 and 2004-05 with respect to the working expenses as a part of gross earnings, the top two profitable railway zones were the South East Central (62.8 percentage and 56.1 percentage) and the East Coast Railways (66.64 percentage and 61.75 percentage). A big part of the profit of the East Coast Railways comes from transporting minerals from various mines in the tribal areas of Orissa.

Despite this, on an average during the last 16 years beginning from 1992-93, the State has received a paltry of Rs 254 crore per annum only. As a whole during the last 16 years, the State has received only Rs 4,070 crore.

While in 1992-93 it had received Rs 68.48 crore, the State received Rs 107.61 crore in 1993-94. Similarly the State received Rs 93.62 crore in 94-95, Rs 149.24 crore in 95-96, Rs 80.29 crore in 96-97, Rs 158.73 crore in 97-98, Rs 254.74 in 98-99, Rs243.74 crore in 99-2000, Rs 239.19 crore in 2000-01, Rs 178.66 in 2001-2002, Rs 194 crore in 2002-03, Rs 306 crore in 2003-04, Rs 360.98 crore in 2004-05, Rs 374.51 crore in 2005-06, Rs 653.90 crore in 2006-07 and Rs 606.51 crore in 2007-08.

Criticising the Ministry of Railways apathetic attitude towards the State, Speaker of Orissa Legislative Assembly Maheswar Mohanty said the Centre had been consistently ignoring the demands of the State in the railway sector for the last several years. “While preparing the Railway Budget, the Centre should take the revenue contribution and economic condition of the State as a criteria rather than taking population into account,” he said.

BJP State president Suresh Pujari has also criticised the Centre’s funding pattern to the State in railway sector.

It may be noted that East Coast Railway that was made functional from April 1, 2003 with three divisions namely, Khurda Road, Sambalpur and Waltair, has a lowest operating cost in the entire country. However, expansion of jurisdiction of East Coast Railways has become a necessity in light of the recent industrial projects coming up in Orissa for ensuring better coordination and facilitation of bulk customers.

In its memorandum which will be submitted to the Prime Minister and Railway Minister, the House Committee of the Orissa Assembly has urged the Ministry of Railways to either extend the jurisdiction of Sambalpur division to include Jharsuguda-Barsuan-Kiriburu, Rourkela-Nuagaon, Jharsuguda-Himgiri or to create a new division with headquarters either at Rourkela or Jharsuguda with its jurisdiction.

Likewise, the jurisdiction of East Coast Railways may be extended to include Bansapani-Padapahar section and Bhadrak-Laxmanath Road section.

Since Independence, only three broad gauge rail links namely, Talcher- Sambalpur, (174 km), Koraput-Rayagada (164 km) and Daitari-Banspani BG rail link have been commissioned. Projects like Lanjigarh Road- Junagarh sanctioned in the year 1993-94 have not been commissioned due to inadequate allotment of funds.

Slow progress of Indian Railways in Orissa: Dharitri

CENTER & ODISHA, ECOR, SER 2 Comments »

A similar article appeared as an op-ed in Samaja about a month back.
20071012rail1.JPG
20071012rail2.JPG
20071012rail3.JPG
20071012rail4.JPG
20071012rail5.JPG

Problems with the survey of Jaleswar-Digha line: Samaja

Balasore, Railways, SER Comments Off on Problems with the survey of Jaleswar-Digha line: Samaja

20070916a_003101002digha-jaleswar.jpg

Dear PM: Drawing your attention towards KBK and tribal area Rail connectivity

APPEAL to readers, CENTER & ODISHA, ECOR, Railway network in Odisha, Railways, SER 13 Comments »

Following is the letter I sent to the PM with copy to Orissa CM, MPs, planning commission and chairman of the railway board. Please consider sending a similar letter to them. If possible please fax the letter to the PMO rather than emailing him.

PM’s fax numbers are 23016857 , 23015603 (Delhi STD code is 11)
Lalu’s fax number is 23387333

To: Dr. Manmohan Singh

Prime Minister

India

Cc: Mr. Arjun Singh, Minister of HRD, Government of India

Cc: Mr. Lalu Yadav, Minister of Railways, Government of India

Cc: Mr. Chandrasekhar Sahu, Union Minister of State, Government of India

Cc: Mr. Naveen Patnaik, Chief Minister, Orissa

Cc: Members of Parliament from Orissa

Cc: Media

Subject: KBK and other adivasi areas of Orissa and India can not be left behind while rest of India marches forward with high speed rail; metro rail and freight corridors

Dear Dr. Singh:

First we would like to convey our heartfelt thanks for your recent higher education initiatives that you outlined in the last Independence Day speech; in particular, the announcement regarding 8 new IITs, 7 new IIMs, and 30 new central Universities with 16 of them going to states that do not have any central university. We sincerely hope that in picking the locations for these institutions you will keep in mind that for 60 years no IIT, IIM or central university have been established in Orissa. As a rapidly industrializing state, our highest priority is a new IIT. Following that, since there already exists 23 central universities, and you plan to have 30 more, and Orissa has none yet, our next priority is to have two new central universities in Orissa. We also request that the central university that is proposed to be in the KBK region should have multiple campuses so that it can cover the vast and tribal areas of KBK and because of the very high tribal and backward population in that area this university should be treated at par with the central universities in the north east. Again, we thank you from our heart for your initiatives and thank the HRD minister Mr. Arjun Singh for his role in this.

The above initiatives have restored in us some of the faith that we had earlier lost in your government. Now we would like to point out another burning issue with respect to Orissa that needs to be urgently addressed.

That issue is Rail connectivity to the hinterlands of Orissa, such as the KBK and other tribal districts of Orissa. As you are very well aware these areas are the most backward and poor areas of India; they have a very high tribal population; and are also infested with extremists. One of the important steps in uplifting these areas is making them well connected to the rest of India. That is where Rail Connectivity comes to picture.

As one of the earlier planning commissions has noted

in http://planningcommission.nic.in/plans/stateplan/sdr_orissa/sdr_orich2.doc

“Railways have always played an important role in economic development and rapid social transformation in all parts of the globe. It is one of the key economic infrastructures. However, it is most unfortunate that in a poor and backward state like Orissa, development of rail networks has received much less attention of the Central Government in the post-independence period. There are as many as seven districts like Boudh, Kandhamal, Deogarh, Nayagarh, Kendrapara, Malkangiri and Nabarangpur out of the 30 districts of the state, which do not have any railway line passing through them. In the year 1998-99, the density of railway route length per 1000 sq. km of area in Orissa was only 15.03 km as against 42.66 km in West Bengal and 19.11 km. at all-India level”.

The Railway ministry has grand plans for the 11th plan period that includes two freight corridors, high speed rail, and metro rail in several areas and it has a budget of Rs 251,000 crores. While none of these high flying plans (2 freight corridors, high speed rail segments and metro rails) are in Orissa, we are not in a position to rue over that; rather we request that while the rest of India marches forward with 2 freight corridors, high speed rail segments and metro rails during the 11th plan, KBK and other adivasi areas of Orissa and India be not left behind. The particular lines we are referring to are:

 

1) Khurda – Balangir

2) Gunupur-Theruvali

3) Lanjigarh Rd – Bhawanipatna – Junagarh – Nabarangpur- Jeypore – Malkangiri – Bhadrachalam Rd (Andhra Pradesh)

4) Talcher – Bimlagarh

5) Bangiriposi -Gurumahishasini and/or Buramara-Chakulia.

6) Badampahar-Keonjhar

Often the Railway ministry and Railway board has labeled some of the pending lines in these areas as unprofitable and has given them such a low priority that at the current rate of funding (annual allocation less than the inflation) these lines may never be completed.

While the railways calculation may show these lines as unprofitable; they are not unprofitable if one considers how much Indian Railways earns from these areas. For example, the ECOR GM Shri Surendra Singh Khurana in his Independence Day address (available at http://eastcoastrailway.gov.in/custom/press_release/index.php) while talking about ECOR, said: “With only 4% of the track of Indian Railways, we cater for about 12% of total loading of Indian railway and about 7% of total earning of IR.” In regards to profitability, for the 2003-2004 and 2004-05 the working expense as part of gross earnings of the ECOR zone is the second best at 66.64% and 61.75% respectively. The profit making zones in those years were South east central (62.8% and 56.1%), ECOR (66.64% and 61.75%), North central (76.33% and 66.71%), Central (80.29% and 82.48%), South eastern (81.24% and 83.51%), South Central (85.72% and 83.62%), West Central (80.99% and 84.08%), South Western (91.35% and 86.15%), Western (93.21% and 90.85%), Northern (91.08% and 92.89%) and East Central (93.65% and 98.9%). The loss making zones were: metro Kolkata (247% and 264.38%), North Eastern (151.93% and 160.88%), Northeast Frontier (147.98% and 159.45%), Eastern (161.3% and 152.84%), Southern (118.55% and 120.79%) and North Western ( 106.26% and 104.98%).

So, if the Indian Railway is making 7% of its earning from ECOR and a much higher percent of its profit from ECOR is not it unfair to give only 4% of its track to ECOR? This means profit and revenue from ECOR is being ploughed into rest of India. Nothing wrong with that per se, except that the part of ECOR that is neglected is the most backward part of India, and has a high tribal percentage. Some of these tribals, without proper connectivity, risk their lives and travel on the roof of freight trains. Does India and Indian Railways want to take money and investment away from the tribal and backward areas to enrich its metro residents?

Dr. Singh: Is that the India of your dreams? Is that the equality and inclusiveness that you talk about in your speeches?

We don’t think so!

Perhaps this has not come to your notice. Perhaps your current planning commission has not brought this to your notice. It is our sincere request that you look at this issue and include in the 11th plan the completion of the earlier mentioned lines and the establishment of a few rail factories in the backward and tribal areas of India, possible 1-2 in the KBK districts.

(Additional data points are in the attached document.)

Sincerely,

Chitta Baral

Railways in North and Northwest Orissa

Angul, Angul - Talcher - Sukinda (under constr.), Balasore, Bargarh, Bhadrakh, Bouda, Deogarh, ECOR, Jakhapura - Daitari, Jharsuguda-Sambalpur- Bargarh, Jharsugurha, Keonjhar, Mayurbhanj, Railway maps, Rourkela-Jharsuguda, Sambalpur, Sambalpur - Talcher, SER, Sonepur, Sundergarh, Talcher - Bimlagarh (under constr.), Titlagarh - Jharsugurha Jn, Tomka - Jaroli Comments Off on Railways in North and Northwest Orissa

ecor-status-april1-2007-north-orissa.JPGecor-status-april1-2007-northwest-orissa.JPG

Keonjhar-Tata passenger carrying train from August 15th

Keonjhar, Railways, SER Comments Off on Keonjhar-Tata passenger carrying train from August 15th

Odisha.com reports that South Eastern Railway will start passenger carrying train between Keonjhar and Tata from August 15th. Some of the stations between Keonjhar and Tata are Keonjhargarh(98)- Goaldih(109)- Porjanpur(116)- Nayagarh(130)- Jaroli(146)- Bansapani (155)-Murg Mahadev Rd(164)-Deojhar(167)-Padapahar (183)- Dangoaposi(188) – Maluka(198)- Kendposi(208)- Talaburu(217)-Jhinkpani(226)-Singhpokharia(235) –Chaibasa (242)-Pandrasali(250)-Rajkharswan(262) (between Chakradharpur and Tata) … Tata (304). Currently a Janshatabdi runs from Howrha to Tata to Barbil via Padapahar. So the proposed new train will newly connect people with access to stations in between Keonjhar and Padapahar to Tata and the rest of the world.

Proposal to connect Bimlagarh and Nayagarh (near Keonjhar) for a shorter Bhubaneswar-Rourkela route

ECOR, Keonjhar, Railways, SER, Sundergarh Comments Off on Proposal to connect Bimlagarh and Nayagarh (near Keonjhar) for a shorter Bhubaneswar-Rourkela route

The following article from Sambada suggests connecting Bimlagarh with Nayagarh (near Keonjhar) for a shorter Bhubaneswar-Rourkela route. It talks about the delay in constructing the Talcher – Bimlagarh line and proposes this alternative.

If Bimlagarh is connected to Nayagarh then the route between Bhubaneswar and Rourkela will consist of the following segments: Bhubaneswar – Jakhapura (92kms), Jakhapura – Tomka (24kms), Tomka – Nayagarh (130kms), Nayagarh – Bimlagarh (30?kms), Bimlagarh – Bondamunda HLT (46.5kms), Bondamunda HLT – Rourkela Jn (12 kms).

Indian Railways and Orissa: Today’s status

Angul, Angul - Talcher - Sukinda (under constr.), Badampahara ... Tata, Balangir, Balasore, Balasore - Niligiri (defunct?), Bargarh, Baripada - Bangiriposi (under constr.), Barsuan - Bimlagarh, Bhadrakh, Bhadrakh-Sarla Rd...Vizag, Bolanikhadan - Padapahar, Bondamunda - Orga..Hatia, CKP ... Bhalulata - Rourkela - Jharsuguda Jn - Daghora , Cuttack, Cuttack - Paradeep, Dhenkanal, ECOR, Gajapati, Ganjam, Gua - Barajamda, Gurumahishasini -Aunlakhor, Haridaspur - Paradeep (under constr.), India map, Jagatsinghpur, Jajpur, Jakhapura - Daitari, Jaroli - Deojhar .. Chaibasa, Jharsugurha, Kalahandi, Kendrapada, Keonjhar, KGP...Lakshannath Rd - Bhadrakh, Khordha, Khurda Rd - Balangir (under constr.), Khurda Rd - Puri, Kiriburu - Bondamunda, Koraput, Koraput - Rayagada, Lanjigarh Rd - Junagarh, Mayurbhanj, Naupada - Gunupur (Gauge conversion), Nawagaon - Punrapani, Overall Odisha, Puri, Railway maps, Railways, Raipur..Khariar Rd - Rayagada - Ladda..Vijainagaram, Rajathagara - Nergundi, Rayagada, Rourkela - Biramitrapur, Rupsa Jn - Baripada, Sambalpur, Sambalpur - Talcher, SER, Sundergarh, Talcher - Barang, Titlagarh - Jharsugurha Jn, Tomka - Jaroli, Vizag ..Shimiliguda - Koraput - Dhanapur ..Kirandul Comments Off on Indian Railways and Orissa: Today’s status

(This is copied from my site on Railway infrastructure in Orissa.)

 

Most of Orissa’s rail network ( full-orissa-map, map-east-n- north-orissa, map-south-n-west-orissa) is part of the East Coast railway( map1, map2, time-table), and a small portion is part of the South eastern railway( map, plans) of Indian Railways. For trains across India see the Indian Railways Schedule, and for trains across Orissa see the ECOR schedule. Maps from IRFCA are here. India9.com has a list of stations and trains related to Orissa.

Rail network description:

(ecor map)

Current railway connectivity and Indian railway websites:

Railway budgets:

  • Plans in the 2007 budget
    • New Trains:
      • Bhubaneswar-Rameswaram Express (weekly) after gauge conversion;
      • Bhubaneswar-Ranchi Garib Rath (tri-weekly) [most likely to follow the route Ranchi-MuriJn-ChandilJn-KandraJn-SiniJn-Chaibasa- Dangoaposi-PadapaharJn-Bansapani-Kenojhargarh- Tomka-SukindaRd-Jakhapura-Cuttack-Bhubaneswar]
    • Increase in Frequency: 2843/2844 Puri-Ahmedabad Express via Rayagada (from triweekly to 4 days in a week); 2835/2836 Hatia-Yesvantpur Express (from weekly to biweekly)
    • Doubling works of Bimlagarh-Dumitra (Part), Barbil-Badajamda, Titlagarh-Raipur have been given approval.
    • Survey for doubling: Sambalpur-Talcher; Khurda Road-Puri
    • Budget Numbers
      • New lines (94 crores total as opposed to 271.85 crores in 2006-07): Koraput-Rayagada (2 crores), Talcher-Sambalpur (3 crores), Lanjigarh Rd-Junagarh (12 crores), KhurdRd-Balangir (20 crores), Haridaspur-Paradeep (20 crores), Talcher-Bimlagarh (15 crores)
      • Gauge conversion (60 crores total as opposed to 49.8 crores in 2006-07): Naupada-Gunupur (25 crores), Rupsa-Bangiriposi ( 35 crores)
      • Doubling (293 crores as opposed to 293.16 crores in 2006-07): Talcher-Cuttack-Paradeep with 2nd bridge on Mahanadi and Birupa (64 crores), Cuttack-Barang (55 crores), Barang-Khurda Rd 3rd line (88 crores), Rajathagarh-Barang (86 crores). [Sambada lists some more doubling projects that is not listed in the pink book (ecor, se). Sambada claims the total 2007-08 budget for doubling to be 449.5 crores.]
  • Plans in the 2006 budget
    • New Trains: Bhubaneswar-Baripada Express (tri-weekly) ; Howrah-Puri Express(bi-weekly) [done]; Bhubaneswar-Pondicherry Express(weekly) [feb14]; Tatanagar – Yesvantpur Express via Rourkela- Sambalpur- Rayagada(weekly) [done]; Howrah-Mumbai Express (weekly)
    • Extension of trains: 7227/7228 Vasco-Vijayawada Express (4 days a week) to Howrah [done]; 8507/8508 Visakhapatnam-Nizamuddin Hirakud Express to Amritsar; 8305/8306 Raipur-Sambalpur Express to Bhubaneswar [done]; 8467/8468 Puri-Jaipur Express to Jodhpur [done]; 8563/8564 Bangalore-Visakhapatnam Prashanti Express to Bhubaneswar; 211/212 Puri-Sambalpur Passenger to Rourkela
    • Increase in Frequency: 5625/5626 Bangalore- Guwahati Express from bi-weekly to tri-weekly [done]
    • In 2006-07, Railways propose to complete over 550 kms of New Lines. The sections include : Keonjhar-Daitari of Banspani-Daitari. With the completion of the above sections, the connection of Jakhapura (near Jajpur Road, between Bhubaneswar and Jajpur Rd) to Daitari, Keonjhar, Bansapani, to Rajkharsuan (between Chakradharpur and Tata) will be complete. See map. This will create alternate paths from Bhubaneswar to Rourkela (not much shorter, if any, than BBSR-Sambalpur-RKL though), and Bhubaneswar to Tata (a bit shorter than BBSR-KGP-Tata).
    • Completion of doubling of Titlagarh-Kesinga, Sambalpur-Sarala and Jharsuguda bye-pass in Orissa. Doubling of Padapahar-Banspani have also been included in the budget. In addition, works of doubling of Sambalpur-Titlagarh have been included in the Budget. Other doubling plans include Koraput-Kirandul, Kottavalasa-Koraput, and Bhadrak-Nergundi 3rd line.
    • Budget numbers: Total of Rs 653.9 crore for Orissa in 2006-07 ( against a request of 800 crores, and 279.39 crore more than allotted in 2005-06.): Rs 19 crore for the Lanjigarha Rd – Bhawanipatna – Junagarh, Rs 23 crore for the Khurda Rd- Balangir, Rs 155.58 crore Daitari-Keonjhar-Banspani, Rs 44 crore for Haridaspur-Paradip, Rs 20 crore for Angul-Duburi- Sukinda Road, and Rs 10 crore for Talcher-Bimalgarh. Rs 15.89 crore has been sanctioned for gauge conversion of Rupsa-Bangiriposi (Simlipal), Rs 34 crore for gauge conversion of Nuapada-Parlakimidi-Gunpur project, and Rs 293.16 crore for 12 doubling projects for 2006-07 as against Rs 170 crore for 2005-06.
    • 2006-07 Budget details at: Pink Book: ECOR details, SER details; Green Book: ECOR, SER.
  • Past Railway budgets: 1996-97, 1997-98, 1998-99, 1999-2000, 2000-01, 2001-02, 2002-03, 2003-04, 2004-05, 2005-06.
  • Railway proj ects in Orissa — 2004 budgetary provisions
  • Requests from Orissa legislator’s in Loksabha debates: [2005: Chandra Sekhar Sahu, Braja Kishore Tripathy, Ananta Nayak, Bikram Keshari Deo, B. Mahtab, Arjun Sethi, Brahmananda Panda, Kharabela Swain, Sangeeta Kumari Singh Deo, Mohan Jena]
  • A twelve year railway budget plan for new lines and gauge conversion in Orissa: [April,1-2006]

New lines, gauge conversions, doublings: [Hindu-April05]

  • Hurdles: 2006-07 ECOR allocation, 2006-07 SER allocation, Baripada-Bangiriposi problem (see page 8-9 of 2006-may-CAG report)
  • New lines in progress or recently completed plus wish list for immediate consideration
    • Daitari-Banspani 155 km, estimated cost Rs 590 corres, 78% complete by May 2004. [map]
    • Lanjigarh-Bhawanipatna-Junagarh 55.67 km, Rs 120 crore, 15% complete on May 2004. [map] Editors note: Highest priority should be to have the following link: Malkangiri (southwestern tip of Orissa) to Jeypore (next to Koraput) to Nabarangpur to Junagarh-Bhawanipatna-Lanjigarh (in Kalahandi district), where Lanjigarh is just south of Titlagarh. (This will bring railways to the districts of Malkangiri, Nabarangpur, Kalahandi in KBK.)
    • Haridaspur-Paradip 82 km, Rs 340 crore, 4.25% complete but on fast track. [map], [Statesman:March2006]
    • Sukinda Road-Angul 90 km, Rs 415 crore, 0.2% complete on May 2004, but on fast track. (Sukinda Rd is in between Jajpur Road and Daitari) [map].
    • Talcher-Bimlagarh (Total: 154 km, Rs 727 crore) [map] [ This will make the shortest distance between BBSR to Rourkela to 308 kms: BBSR-Talcher (114) + Talcher-Bimlagarh(154) + Bimlagarh-Rourkela(40). Other alternate paths between BBSR-Rourkela are: BBSR-KGP-Rourkela (440-115+412-115= 325+ 297=622); BBSR-Talcher-Sambalpur-Rourkela (440); BBSR-Jakhapura-Daitari-Bansapani-Rajkharswan- Rourkela (92+38+155+108+122=515); BBSR-Bansapani-Padapahar-Bolanikhadan-?- Kiriburu-Bondamunda-Rourkela (285+28+32+ 15+85+7=452). ]
    • Khurda Road-Bolangir 290 km, Rs 700 crore, 6% (survey) complete by May 2004. [map]
    • Gunupur-Therubali: [map]
    • Bangriposi-Gurumahishasini: see mention in 2005 budget — section 91.III.11 (connecting Gurumahishasini to Bangiriposi and then having broad gauge till Rupsa gives the path TATA-Baripada-Rupsa; [an alternate demand by people]); [SER plan], [SER plan2], [map]
    • Chakulia-Buramara: [SER plan], [SER plan2], [people’s demand]
    • Jaleswar-Digha: [SER plan], [SER plan2]
    • Wishlist: Kiriburu-Bolanikhadan (about 10 kms) — will result in the path Rourkela-Bimlagarh-Kiriburu- Barbil-Bansapani-Jakhapura-Cuttack- Bhubaneswar: [google-image], [map].
    • Wishlist: Naraj-Khordha-Khurda-Road line as part of a circular rail for the Bhubaneswar area, Khordha-KhurdaRd should be constructed immediately as part of the KhurdaRd-Balangir line, then complete the Khorda-Naraj part and then make Khorda another reliever station for Bhubaneswar. Then there should be a train running between Cuttack-Barang-Bhubaneswar- Khurda Rd-Khordha-Naraj-Barang at frequent intervals.
    • Recently completed or planned to be completed: Koraput-Raygada (Dec 1995), Talcher-Sambalpur (Aug 1998), Rupsa-Baripada (Sept 2005), Daitari-Bansapani (scheduled – 2006/07).
  • Gauge Conversion:
  • Doubling projects:
    • 32-km Raghunathpur-Cuttack stretch on the Cuttack-Paradip section
    • 24-km stretches between Norla Road and Lanjigarh Road and between Titlagarh and Kesinga on the Titlagarh-Lanjigarh section on the Raipur-Vizag route
    • Sambalpur-Rengali (22.7 km)
    • Rajathgarh-Barang (31.5 km)
    • Khurda Road-Puri (15.3 km)
    • Cuttack-Barang (11.7 km)
    • Khurda Road-Barang (35 km)
  • New lines under consideration: surveying stage (Baragarh-NawaparaRd, Gunupur-Therubali and Puri-Konark survey are mentioned in 91.II.5, 91.II.1 and 91.II.3 of 2005 budget):
    • Jeypore-Kottameta new BG rail link, 128 kms
    • Puri-Konark new BG rail link, 30 kms
    • Phulbani-Berhampur new BG line, 175 kms
    • Talcher/Hindol Road -Gopalpur/Berhampur new BG rail link, 245 ms
    • Talcher-Bimlagarh new BG rail link, 130 kms
    • Bargarh-Nawapara Road new BG link via Padampur, 120 kms
    • Jeypore-Nawarangpur new BG line, 45 kms (and then extended to Junagarh)
    • Jeypur-Malkangiri
    • Editor’s wish list: Therubali-Angul-Keonjhar-Badampahar (will result in the paths Jeypore-Koraput-Rayagada- Therubali-Angul-BBSR, Jeypore-Koraput-Rayagada- Therubali-Angul-Sukinda-Jajpur Rd-Balasore- Howrah, Kirandul-Jeypore- Koraput- Rayagada- Therubali- Angul-Keonjhar-Bansapani-Ranchi, Jeypore – Koraput-Rayagada-Therubali-Angul- Keonjhar -Badam Pahar-Jamshedpur)
    • Editor’s wish list: Jajpur Rd- Jajpur-Aradi- Chandbali- Dhamara port
    • Other links in Orissa govt’s list: Raygada-Gopalpur, Jaleshwar-Digha, Keonjhar-Badampahar.

Future Plans:

  • Rail Traffic Projections: [NewIndPress:Aug9-05]
  • A twelve year railway budget plan for new lines and gauge conversion in Orissa: [April,1-2006]
  • New trains, extension and increased frequencies: wish list for 2007 and beyond
    • Goal: Better connectivity between BBSR and Rourkela.
      • Introduce a BBSR-Rourkela half day Intercity train and/or extend BBSR-Sambalpur train to Rourkela. [BBSR-Rourkela distance is Rourkela-Jharsuguda (102) + Jharsuguda-Sambalpur (49)+ Sambalpur-Talcher(175) + Talcher-Barang(98) + Barang-BBSR (16) = 440km] So a BBSR-Howrah (437 km) Janashtabdi/Dhauli kind of timing, or the BBSR-Vijag (443km) Intercity timing would be ok. For example: If it starts from BBSR at 6 AM then using the 8413 timing it can reach Sambalpur by 11 AM and can reach Rourkela by 1:40 PM. Then it can leave Rourkela by 2:30 PM and reach BBSR by 10:10 PM. If this is successful then have another train with the opposite timing. I.e., leaving Rourkela at 6 AM reaching BBSR at 1:40 PM and leaving BBSR at 2:30 PM and reaching Rourkela at 10:10 PM. Extend Puri-Sambalpur and Rayagada-Sambalpur expresses to Jharsuguda so that passengers from BBSR/Puri/CTC can connect to many of the trains that go west (to Mumbai, Pune, Ahmedabad etc.) from Jharsuguda.
    • Goal: More frequency between BBSR and Mumbai: Do one or more of the following.
      • Easiest: Extend Visakha-Express to Mumbai.
      • Next: Extend the newly extended 8305/8306 Raipur-Bhubaneswar express to Mumbai (via Nagpur) [Alternatively extend this train to Bhopal via Nagpur]
      • Extend Vidarbha or Sevagram Express (between Mumbai and Nagpur) to Bhubaneswar (via Raipur-Titlagarh-Bargarh-Sambalpur-Dhenkanal) [Also increases connectivity to Nagpur]
      • Increase frequency of weekly 2145/2146 BBSR-Mumbai express(so that twice a week it goes in the current route via Anugul-Sambalpur, twice a week it goes via Vijainagaram-Rayagada- Titlagarh- Raipur, and thrice a week via Vizag-Koraput- Rayagada-Raipur); [Similar to the trains connecting Puri-BBSR to ADI.]
    • Goal: Increase connectivity between Western Orissa and Allahbad-Delhi ( Public demand):
      • Extend 8601 Hatia Jammu Tawi express (now via Allahbad and Delhi) to Sambalpur (via Rourkela) first and may be after a year all the way till Bhubaneswar
      • Extend 2817/8603 Hatia-Delhi Samjhouta Express (via Allahbad) to Sambalpur (via Rourkela).
      • Increase frequency of Vizag-Delhi(now planned to be extended to Amritsar) express and on the new days let it take the route of Vizag-Koraput-Rayagada-Titilagarh-Balangir- Sambalpur and then follow the rest of the schedule.
    • Increase frequency of BBSR Rajdhani (perhaps once or twice plying through Sambalpur, once plying through Keonjhar, and going beyond BBSR to Viskhapatnam);
    • Goal: Better connection between western Orissa and South India, especially Hyderabad ( Public demand) [There are direct trains from Rourkela/Sambalpur to Bhubaneswar, Howrah, Mumbai, Delhi, Chennai, Bangalore, but none to Hyderabad currently]:
      • Extend 6512 Bilaspur-Bangalore Express (via Hyderabad) to Rourkela or via Rourkela to Hatia/Ranchi or Tata.
      • Extend Vizag-Hyderabad Godavari express to Rourkela.
      • Introduce a Tata-Hyderabad Express going through Rourkela. [This should be happening soon, as Tata has excellent connections to all parts of India except to Hyderabad. May be ECOR can chip in towards this.] (Note in 2006 budget a new weekly Tata- Bangalore express is proposed. This may be routed through Hyderabad.)
    • Have a new Rayagada-Raipur (343 kms) day time express and Balangir-Vijainagaram (336 km) day-time express.
    • Increase frequency of weekly BBSR-Bangalore express and extend it to Mysore;
    • A Bhopal-Nagpur-BBSR-Puri train. (Bhopal and Nagpur are very close to Orissa but are not properly connected to BBSR by Rail.)
    • Extend Dhanbad-Tata Subarnreka express to Bhubaneswar.
    • Extend 8102 Muri express (Tata/Hatia-Jammu Tawi) to Bhubaneswar via Keonjhar (on the Hatia part) and Bhubaneswar via Kharagpur and Balasore on the Tata part.
    • A weekly Puri-Bhubaneswar-Sambalpur-Jabalpur-Bhopal-Kandla express
    • Extend Puri-Jodhpur express to Jaisalmer
    • A weekly Puri-Jaipur-Bikaner express
    • A weekly BBSR-Chennai-Tuticorn express
    • A weekly BBSR-Chennai-Cape express
    • A weekly BBSR-Chennai-Trivendrum express
    • A weekly BBSR-Chennai-Mangalore-Calicut express.
    • Once Daitari-Bansapani line is completed: a Tata-Puri passenger as well as a BBSR-TATA Intercity express via Keonjhar. [BBSR-Tata distance via Keonjhar will be about 421Kms: BBSR-Jakhapura (92) + Jakhapura -Tomka(24) + Tomka-Bansapani(155)+ Bansapani- Rajkharswan(108) + Rajkharswan-Tata(42)] Just for reference: BBSR-KGP-Tata = (440-115) + (249-115) = 325+134 = 459 kms.
    • Once Daitari-Bansapani line is completed, run one of the BBSR-SiniJn-Delhi train via Keonjhar on some of the days. (BBSR-Kenojhar-Sini = 410 kms while BBSR-Tata-Sini=486 kms)
    • a daily North Orissa Express train between Baripada and Puri. (in 2006-07 plan there is a thrice daily Baripada-BBSR train. This train is operational now.)
    • extend one of the trains to Delhi to beyond say Chandigarh/Jammu
    • a daily train between Baripada and Sambalpur;
    • a daily train between Rourkela and Berhampur;
    • a daily train between Paradeep and Berhampur;
    • extend 8447/8448 BBSR-Koraput express upto Jeypur;
    • increase frequency of 5639/5640 weekly Puri – Guwahati express;
    • once the line between Howrah-BBSR is completely electrified [done Dec 1 05] an almost non-stop twice a day, 4 hrs each way train between Howrah-BBSR;
    • Extend Konark express to start from Baripada as well as 2145/2146 BBSR-Mumbai express to start from Baripada. [There are direct trains from Balasore to BBSR, Howrah, Delhi, Bangalore, Chennai, Hyderabad, but none to Mumbai. In general all train going west that start from BBSR should be extended to Balasore];
    • make a reliever station to Bhubaneswar with express halts at Patia. It is 1 km to the right of Magnetic Square in this map, and 2 km to the top of Patia square in this map. Note that this station is 3 km from Infocity, 1 km from KIIT, 2 km from Silicon, 3.5 km from Trident, 2 km from Koustuv, 2 km from College of Engg, 2 km from CIPET, 5 km from Fortune tower, etc.
  • People’s demand: [Pioneer July’05: Extension of Raipur-Sambalpur intercity express to Bhubaneswar instead of Sambalpur [in 2006-07 plan], completion of Khurda-Balangir Railway Line, extension of Bhubaneswar -Sambalpur intercity express to Titilagarh instead of Sambalpur]
  • Orissa integration plan (July 2005):
    • Now: lots of trains in the route Howrah- Kharagpur -Balasore-BBSR-Berhampur- Palasa-Vizag and Howrah-Rourkela-Mumbai; and many trains in the line Sambalpur-Dhenkanal-Bhubaneswar.
    • in 5 years: 2 fast express trains daily between: Koraput-Raygada-Gunupur-BBSR, Tata-Baripada- Rupsa-BBSR, Rourkela-Bansapani-BBSR, Chakradharpur-Keonjhargarh-Bhubaneswar; every two hours during the day trains between Puri-BBSR, Paradeep-BBSR, Berhempur-BBSR, Dhenkanal-BBSR, Bhadrakh-BBSR
    • in 10 years: 2 express trains daily between Junagarh-Bhawanipatna-LanjigarhRd-Titlagarh- Balangir-Phulbani-BBSR, 1 express train daily in the route Rourkela-Bimlagarh-Talcher-BBSR

Rail freight corridor: [TOI-Oct20-05] RVNL (Rail Vikas Nigam Limited) : projects, public notices