Archive for the 'TRANSPORT AND COMMUNICATION' Category

IDCO RFQ (Request for qualification) for modern bus terminals in Cuttack, Sambalpur, Dhenkanal and Angul

Angul, Anugul- Talcher - Saranga- Nalconagar, Bhubaneswar- Cuttack- Puri, Cuttack, Dhenkanal, Modern Bus Stands, Roads, highways and Bus stands, Sambalpur, Sambaplur- Burla- Bargarh- Chipilima Comments Off on IDCO RFQ (Request for qualification) for modern bus terminals in Cuttack, Sambalpur, Dhenkanal and Angul

Land acquisition status of the proposed shipyard near Dhamara

Bhadrakh, Dhamara port (under constr.), Dhamara- Chandbali- Bhitarakanika, IDCO, Land acquisition, Sambada (in Odia) Comments Off on Land acquisition status of the proposed shipyard near Dhamara

Second Railway Bridge over Mahanadi complete

Bhadrakh-Sarla Rd...Vizag, Cuttack Comments Off on Second Railway Bridge over Mahanadi complete

Following is an excerpt from a report in New Indian Express.

The ambitious second railway bridge project over river Mahanadi near Cuttack is complete.

About Rs 124 crore was invested in putting up the gigantic structure, the length of which spans over 2.1 km.

… With its completion, the doubling of the Talcher-Cuttack-Paradip railway track has also come to an end.

Sources said, the completion of the project and the doubling of rail tracks will help the railways run more coal-laden wagons from Talcher and Paradip to the thermal power stations in South India. Besides, the new infrastructure will allow smooth movement of passenger trains and reduce delays.

According to Rail Vikas Nigam Limited, the project was completed a few months ahead of the scheduled period of three years. In all two firms were involved in putting up the second bridge. While Mumbai-based Gammon India laid the foundation and the sub-structure of the bridge, Kolkata-based Braithwaite Burn and Jessop Construction gave shape to the super-structure.

The structure consumed 8,200 tonne of structural steel. No date was, however, announced about its commissioning. Laying of the rail tracks to the end point of the bridge from Cuttack station-end and Kendrapara road station-end was yet to be completed.

Deccan Aviation considering flights to Bhitarkanika

Air Deccan, Airports and air connectivity, Bhitarakanika Comments Off on Deccan Aviation considering flights to Bhitarkanika

Following is an excerpt from a report in Pioneer.

Air Deccan is going to offer special packages to the tourists to visit Bhitarkanika mangrove forest, the second largest mangrove forest of India. Apart from that they would get a chance to pay a visit to the beaches of Gahirmatha marine sanctuary, the world’s largest rookery of endangered Olive Ridley sea turtles, the doorless village of Sialia under Rajkania, the magnificent Royal palace of Rajkanika, Hukitola island and nearby tourists spots, said managing director of Deccan Aviation Captain Gopinath on Saturday at Rajkanika.

Gopinath along with a senior official of Deccan Aviation PB Devaya, visited Bhitarkanika on a helicopter on Saturday. The helicopter landed on the ground of royal palace of Rajkanika. The scion of royal family of Rajkanika Shivendu Narayan Bhanjadeo accompanied the officials, who visited the water bodies and dense mangrove forests on a boat. Bhanjadeo said, "As the park is situated about 110 km from Bhubaneswar and the connecting road conditions from the capital city to Bhitarkanika are not so good for which tourists are not taking interest to visit the park."

"As no air communication facilities was available from Bhubaneswar to Bhitarkanika, a couple months ago, I urged the officials of Deccan Aviation to take initiatives to run flights to the national park to boost tourist inflow. After getting invitation, two senior officials visited Bhitarkanika to conduct a survey. Presently, the ground of the palace at Rajkanika will be used as a temporary airfield or helipad for the landing of helicopters and small planes", said Bhanjadeo.

Recently, the State Government formed a Bhitarkanika Eco-Tourism Society (BETS) to attract more tourists to Bhitarkanika, said Bhanjadeo, who is also a member of the society.

The forest officials have recently constructed a tower in Bhitarkanika for the tourists to watch the birds, spotted deer, wild boars, water monitors, crocodiles, snakes and other animals from the top.

Progress on NH 215 (Panikoili – Barajamda) – Samaja

NH 215 (348 Kms: NH-5@Panikoli - Anandapur - Kendujhargarh -Rajamundra @NH-23) Comments Off on Progress on NH 215 (Panikoili – Barajamda) – Samaja

CM meets the union tourism minister

Airports and air connectivity, Bhubaneswar- Cuttack- Puri, Chief Minister's actions, Khordha, Konark, Press release, Odisha Govt., Puri, Puri, Railways, Sites in and around Bhubaneswar, TOURISM, ENTERTAINMENT and SHOPPING, Tourist promotion Comments Off on CM meets the union tourism minister

The following is from http://rc.orissa.gov.in/index3.asp?linkid=30&sublinkid=411.

PRESS RELEASE

DT.20.03.2008

GOVERNMENT OF ORISSA PRESS RELEASE

New Delhi March 20, 2008

Shri Naveen Patnaik, Chief Minister, Orissa met Smt. Ambika Soni, Union Minister, Tourism & Culture today and discussed about various tourism projects of the State. The Chief Minister demanded for an early sanction of Rs.50 crore for development of tourism infrastructure and facilities in the famous tourism circuit of Bhubaneswar-Konark-Puri-Chilika under the Mega Circuit Scheme. The Union Minister agreed to include the circuit of Bhubaneswar-Konark-Puri-Chilika under the Mega Circuit Scheme and extend all necessary assistance under the scheme for its integrated development. She also agreed to consider release of 50% of the funds immediately.

The Chief Minister asked for a direct flight and a thematic tourist train to connect Varanasi and Bodhigaya with the Buddhist sites of Orissa. This would provide a great boost to employment and tourism in the State. The Union Minister intimated that the Government of India will extend all support for the connectivity of the Buddist sites. She also agreed to take up the matter with the Ministry of Civil Aviation and Ministry of Railways soon. She also intimated that the matter of rail connectivity of Bhubaneswar, Banaras and Gaya will be discussed with the Planning Commission and Ministry of Railways soon.

The Chief Minister urged the Union Minister to take up the project of sound and light show for Konark, which is a world heritage site and also for the historic Barabati Fort at Cuttack. The Union Minister was also requested for expeditious completion of the sound and light show at Khandagiri. The Chief Minister also demanded for better maintenance of the historical monuments, Buddhist sites, temples and other protected monuments by the Archeological Survey of India.

Status of national waterways

National Waterway 5 2 Comments »

Following is from http://pib.nic.in/release/release.asp?relid=.36825.

RAJYA SABHA

 

 

The Government has declared three rivers/canal system, as National Waterways namely (i) the Ganga from Allahabad to Haldia (1620km) (ii) the Brahmaputra from Sadiya to Dhubri (891km) and  (iii) the West Coast Canal from Kollam to Kottapuram along with Champakara and Udyogmandal canals (205km). Basic infrastructural facilities for shipping and navigation namely navigational channel, navigational aids, and terminals are being provided on these National Waterways. 

Further, following three rivers/canal systems are in the process of declaration as National Waterways.

(i)         Kakinada-Puducherry Canals along with rivers Godavari and Krishna (1095km).

(ii)        East Coast Canal along with river Brahmani and Mahanadi Delta (623km).

(iii)        River Barak (121km).

An action plan has been drawn up to make the three existing National Waterways fully functional by March 2010, subject to availability of funds. 

This information was given  by the Minister of Shipping, Road Transport and Highways, Shri T.R. Baalu in a written reply in the Rajya Sabha today.

Orissa proposes several sites to the central govt. for an international size shipyard

Astaranga, Puri (Navayuga interested), Bahuda Muhana, Ganjam (many interested), Gopalpur port (under constr.), Odisha govt. action, Palur, Ganjam (Future metals interested) 1 Comment »

Following is from http://pib.nic.in/release/release.asp?relid=36827.

RAJYA SABHA

There is a proposal for setting up two international size shipyards, one on the East Coast and another on the West Coast of India. 

An international size shipyard may build and repair ships upto the size of Very Large Crude Carrier (VLCC) which has a carrying capacity of 300,000 Tonnes (DWT).  The shipyard may be located in a place which has 10-12 metres water depth at the jetty.  The international size shipyard may have at least two and preferably three big dry docks (2 for building and 1 for repair), a quayside length of at least 2.5 kms and various support facilities for building and assembly of ships.   

 

Maritime States were requested by the Ministry of Shipping, Road Transport and Highways to identify suitable location for setting up of international size shipyards, one each on the East Coast and West Coast of India respectively.  In response, the following locations have been suggested by the Maritime States: 
 

S. No. Name of State Site Proposed/Response of the State Government
1. Government of Karnataka Tadri Port (Kundle Beach) and Honne Beach under Belekeri Port
2. Government of Kerala Poovar in Thiruvananthapuram District onKerala-Tamil Nadu Border
3. Government of Orissa (i) Nuagarh (Astaranga) Distt. Puri (ii) Palur, Distt. Ganjam(iii) Gopalpur Port at Arjipalli, Chatrapur, Distt. Ganjam(iv) Bahuda Muhana (Sonepur), Distt. Ganjam
4. Government of Andhra Pradesh Vodarevu in Prakasam District
5. Government of West Bengal No specific site proposed as yet.
6. Government of Gujarat Government of Gujarat has proposed a few stretches such as Salaya, Jodiya, Mundra, Chanch and Pipavav and Tuna. 

   Upon receipt of the proposals from the State Governments, further information/clarifications have been sought by the Ministry of Shipping, Road Transport and Highways from the respective State Governments.   

The nodal agencies viz. Ennore Port Limited and Mumbai Port Trust have been authorized to appoint Consultants with clear terms of reference who inter alia, would identify 3 or 4 alternative sites each for setting up of shipyard on West Coast and East Coast of India respectively and also suggest optimal locations with detailed justification.  The process for appointment of Consultants has been initiated by the nodal agencies. 

 

 The following basic requirements are preferable for setting up of an international size shipyard: 

(i) The minimum land requirement of 1000-1500 acres and waterfront of about 2.5 Kms in length; 

(ii) Water draft of 10 to 12 metres;

(iii) The site location for the proposed shipyards to have good rail and road connectivity;

(iv) Contiguity to a Major Port situated within the State. 

This information was given  by the Minister of Shipping, Road Transport and Highways, Shri T.R. Baalu in a written reply in the Rajya Sabha today.

Detailed route of the Ranchi – Vijaywada highway through Orissa

Vijaywada-Ranchi highway Comments Off on Detailed route of the Ranchi – Vijaywada highway through Orissa

The following is from pages 39-41 of The following is an excerpt from http://morth.nic.in/writereaddata/noticeimages/Ultimate_RFP4418252769.pdf.

Orissa part of Ranchi-Vijaywada highway – call for consultants

Vijaywada-Ranchi highway 1 Comment »

Some of the information on this is available at:

The following is an excerpt from http://morth.nic.in/writereaddata/noticeimages/Ultimate_RFP4418252769.pdf.

The Government of India with the cooperation of State Government intends to improve the communication infrastructure in the back ward area affected by naxalites and bring the backward area to the mainstream by removing the development disparity. This road has been planned to combat extremist activities in the border districts of Orissa as well as social upliftment of tribal people. The road from Vijayawada enters in Orissa at Motu in Malkangiri in south Orissa and leaves the State near Tiring in Mayurbhanj District in the north. The proposed road passes through 12 backward districts of Orissa. This road traverses through different topography. The route virtually passing middle of the State longitudinally, has been chosen carefully after identifying the disturbed area. Construction of this road shall help to bring about radical changes in the life style of the tribal people of the State, who often are subjected to coercion by extremists, by bringing in improved economic activities and improved law and order situation.

Most of the roads stretches are deficient in lane width, crust, formation height, drainage, CD works etc. It is necessary to work out an improvement strategy depending on sound engineering practice whereby all the weak points of road is attended to. Therefore, it is decided to engage Domestic Consultants to carry out the detailed project preparation for the roads & bridges by updating / redoing the available engineering data and supplementing with further investigation and data. The proposed improvement works shall consist mainly in raising the formation level, widening to two-lane from the existing single-lane/ intermediate-lane width, pavement strengthening and improving the cross drainage works. The road alignment comprises of predominantly single lane State Roads and Below Standard single lane in rural roads and DL/IL in NH stretches. The average formation width also varies considerably from 5m in Rural roads to 8 to 10m in State roads and 10-12m in NHs.. The Right of way also varies from 10m in the rural roads to 15-20m in SH/DR to 30-45m in NH. Most of the road stretches do not have appropriate geometrics. Some of the stretches have also deficient formation height.

The road is having a total length of 1219 km consisting of NH, SH, District roads and Village roads. Government of Orissa from its own resources have already started preparation of DPR of about 163 km of roads. Leaving aside the NH portion of the alignment, which will be taken up subsequently, it is decided to take up preparation of Detailed Project Report along with bid documents for balance about 600 km of SH and other category of roads. For convenience of administration, this 600 km of road has been divided to ten packages; the details of stretches which are included in the scope of work are provided in the Annexure-I.

The State of Orissa experiences annual rainfall of about 1500 mm and the maximum temperature during the summer from April to June is about 45 degree Celsius and minimum during winter from November to January is about 7 degree Celsius. The alignment is away from coastal area and the closest to the sea location is Aska and Digapahandi which will be about 50km from Bay of Bengal. The alignment is passing through predominantly plain/rolling terrain and hilly terrain.

2. OBJECTIVES The objectives of this consultancy services would be to carry out, feasibility study, detailed engineering design and project preparation (including BOQ, Bid documents and preparation of quality control manual for supervision) for the specific package indicated in Annexure-I. All the roads shall be improved to two lane carriageway with or without paved shoulder depending on the composition of traffic.

Accordingly, the objectives of this consultancy package will include: The feasibility study shall inter alias include traffic surveys, analysis and growth projections, fixing broad contour of the project, working out widening, realignment, bypass options, working out pavement rehabilitation/reconstruction options, working out rehabilitation/reconstruction options for bridges and CD works, working out schemes for various improvement features like intersections, service roads, underpasses, bus bays etc, environmental and social screening of the project and determination of preliminary cost of the project and carrying out economic analysis. Detailed Engineering Design and Project Preparation shall inter alias include detailed highway design (alignment plan and profile), design of pavement, design of bridges and CD works, design of other improvement works and road furniture, environmental and social safeguard plans, detailed working drawings, detailed cost estimate, BOQ, Economic Analysis, and Bid Document Preparation.

 

Orissa to rework its coastal highway plan

Balasore, Bhadrakh, Coastal highway, Coastal highway - beach preservation, Ganjam, Jagatsinghpur, Kendrapada, Khordha, Odisha govt. action, Puri 1 Comment »

Following is from a report in New Indian Express.

The State Government has decided to revive the Gopalpur-Digha coastal highway proposal. Announcing this on Monday during question hour, Parliamentary Affairs Minister Raghunath Mohanty said the proposal would be submitted to the Centre for approval after completion of the feasibility report.

Mohanty, who was replying on behalf of Chief Minister Naveen Patnaik, said that the length of the highway will be 573 km. Of this, the Astaranga-Dhamra patch will be 245 km while the length of Astaranga-Gopalpur will be 180 km. The patch of highway from Dhamra to Subarnarekha will be 148 km.

The State Government had earlier submitted a proposal to the Centre and requested that it should be included in a Central scheme. However, the proposal was rejected as it did not confirm to the guidelines of the Planning Commission.

Rail connectivity to ports

Choumukha-Kirtania, Balasore (Creative ports, Chennai interested), Dhamara port (under constr.), Gopalpur port (under constr.) Comments Off on Rail connectivity to ports

Following is from the PIB http://pib.nic.in/release/release.asp?relid=36480.

RAJYA SABHA

            The list of Ports where Railways are considering rail connectivity is given hereunder:

S.No.

State

Port

1.

Maharashtra

1.       Rewas Port

2.       PNP Port

3.       Dighi Port

2.

Orissa

1.       Dharma Port

2.       Kirtania Port

3.       Gopalpur Port

3.

Andhra Pradesh

1.       Gangavaram Port

2.       Krishnapatam Port

3.       Machilipatnam Port

4.       Nizampatnam Port

5.       Kakinada Port

4.

Gujarat

1.       Hazira Port

2.       Bedi Port

3.       Porbandar Port

4.       Rozi Port

5.       Dahej Port

5.

Tamil Nadu

1.       Karaikal Port

2.       Ennore Port

6.

Kerala

1.       Vallarpadam Port

7.

Karnataka

      1.   Belekeri Port

8.

West Bengal

      1.   Diamond Harbor

           

            The status of the proposals in Gujarat is as under :

Gujarat :

·         Gujarat Maritime Board had commissioned M/s. RITES for a feasibility cum traffic survey report for providing rail connectivity to Rozi & Bedi Port from Windmill Station in year 2003.  GMB has yet to approach Railways for rail connectivity.

·         Gujarat Maritime Board had commissioner M/s RITES for a survey to provide connectivity to Porbandar Port.  The report was submitted in June 2002.  GMB is considering constructing a rail link of 5.1 km from Porbandar to Porbandar Port at their own cost.

            This information was given by the Minister of State for Railways, Shri R. Velu in a written reply in the Rajya Sabha today.

Orissa MPs’ statements in the LokSabha on the Railway budget

ECOR, Odisha MPs, Railway Budget 2008, SER Comments Off on Orissa MPs’ statements in the LokSabha on the Railway budget

Statements were made by B. Mahtab, B. Panda, Braja K Tripathy,  Arjun Sethi, Prasanna Patsani, Ananta Nayak and Kharabela Swain.  They asked for all kinds of things. I wish they had prioritized and focused on 2-3 things, namely Khurda-Balangir, Lanjigarh Rd – Junagarh – Jeypore – Malkangiri and Baripada – Bangiriposi – Buramara on the basis of connecting to tribal and naxal infested hinterlands. Following is the transcript from http://164.100.24.209/newls/textofdebatedetail.aspx?sdate=03/10/2008.

*SHRI B. MAHTAB (CUTTACK) : Respected Sir, I stand here today to deliberate on the Railway Budget 2008-09 which has received both laurels and brickbats from the thinking public. At the outset I must mention that the Railway Minister’s opening remarks about a cash surplus of Rs 25,000 crore before dividend is clearly a meaningless figure. The surplus after payment of all dues, including dividend, to the general exchequer is only Rs 13,534 crore. This is what can be invested. This is Mr Lalu Prasadji’s fifth consecutive Rail Budget. This years Railway Budget reads like a wish list for the Indian Railways. Announcements like capacity bulding of high density network, port connectivity, freight corriders, stainless steel wagons, higher axle loads etc. on the freight side are praiseworthy and in the passenger sector, use of stainless coaches, green toilets, improved passenger infromation systems and facilities, reduction of fares etc. will please many no doubt, yet there is cause for concern too. The pronouncements do not match the deeds. The budget is an occasion to review the progress of important projects. Apart from the DFC, mega projects like the wheel factory at Chhapra, Electric Loco Factory at Madhepura, the coach unit at RaeBareilly and the Diesel Loco Factory have yet to take off. A new coach factory in Kerala has been added to this list now. The list of sanctioned railway projects of maybe more than Rs 75,000 crore is now a serious worry since more get added each year with painfully slow completion. The production units of Indian Railway loco works at Chittaranjan, Varanasi, coach units at Chennai and Kapurthala, wheel factory at Bengaluru can be made into international hubs supplying to railway system worldwide with more capital investment and new technology. But very little has been said on this. The minister had announced a possible corporatisation of Rail Coach Factory Kapurthala in the 2006-07 budget. What progress has been done in this direction?

 

 

* Laid on the Table.



           Budget 2007-08 had spoken of pre-feasibility studies for high speed train corridors which do not find any mention this year. I hope the idea has not been abandoned as such links will bring economic development around important cities as it has taken place in other countries. But the Railway Minister has demonstrated lack of vision. I fail to under the logic of growth rate of 8% by the Railways when the entire economy is growing at a rate of 8.5% to 9%. The cash surplus figures, which I have stated earlier in just bunkum. If the Railways has a cash surplus of Rs 25000 crore then what was the need for seeking budgetary support from the Union Finance Ministry? What one should understand is how much is the quantum of investible surplus.

There are a lot of anomolies when one goes into the details of this years Railway Budget. The freight loading may be taken as an example. The freight loading target of 850 million tonnes is marginally less than the 8 percent growth rate target of 858 million tonnes projected for the Ninth Plan by the Railways. How can one say there is progress?

Similarly an adhoc provision of Rs 5000 crore for expenditure arising from anticipated recommendations of the Sixth Pay Commission would appear to be less than the 30 percent increase experienced at the time of implementation of the Fifth Pay Commission recommendation. It can only be hoped that this figure will not be wide of the mark. The allotment of only Rs 600 crore for bridges, as compared to Rs 700 crore for Road over Bridge / Road under Bridges seem inadequate when one takes into consideration that a large number of bridges even now require attention, being more than 100 years old and particularly considering the increased axle loads being permitted or proposed to be introduced. Higher levels of Overloading are taking place now. I am sure the Government is aware about the Railway study made recently on the South Eastern sector which has revealed that the extent of overloading has gone up significantly after the axle load was increased to 22.9 tonnes from 20.32 tonnes. We are all aware that South Eastern Railway deals primarily with iron ore traffic. Earlies, that is, before 2005, wagons were overloaded to the extent of 24-25 tonnes per axle most of the time, However, in 2006 and 2007, when Railways allowed higher levels (22.9 tonnes) of axle load, wagons were over loaded at 28-29 tonnes and even 30 tonnes per axle at times. Excess loads damages the rail tracks and wheels resulting in faster wear and tear. For Railways, which uses the same tracks to such passenger trains this has emerged as a major concern as damaged rails could even result in accidents if not detected on time, apart from higher maintenance costs.

In the past four years, Indian Railways transported an additional 233 million tonnes of originating freight traffic and in the next four years, it proposes to handle an additional 310 mt. How it is going to be achieved? It is not clear from the Budget for 2008-09. What has been presented in the Budget are some sign posts; not a clear road map. The freight traffic growth of the Railways has been steadily dwindling. For the past few years, the Railways has been transporting on an average an additional 60mt every year. The fallout of it is that the Railways continue to lose its market share to other modes of transportation. Nothing substantial has been done to meet this challenge.

I now come to another unpleasant issue. There was no crying demand for bringing the fares down, certainly not from those who travelled AC First, AC Sleeper or AC Chair Car. They would not have minded if the Railway Minister had maintained the status quo for they choose the higher classes of their own volition, only after making sure that they can afford it. The fare reduction of those classes are not also such as to attract significantly more passengers. Similarly, the tinkering with freight reduction too will have only a marginal effect on prices, if at all. There is no specific assurance in the Budget speech that so many new trains will not cause serious traffic congestion and affect the quality and regularity of track maintenance and that they will not compromise safety consideration. New passenger trains also eat into the time and space for movement of goods train which are not only the chief bread winner of the system but also keep the sinew’s of the economy strong. Any operational decision that slows them down will have a cascading effect in the sense of pulling down the volume and velocity of transactions in all resorts. For these reasons, the Traffic wing of the Railway Board had always been opposed to excessive number of new passenger trains.

This year Fifty-three new trains have been announced on a saturated system, without making provision to improve the infrastructure. Speed of trains is the other aspect which needs deliberation. On a high-density network, accounting for nearly one-third of the coun­try’s total rail network of 66,000 km, the coverage speed of passenger train is 55 km and goods train 20 km. Even Rajdhani and Shatabdi Express run at an average speed of 75 km. The Fastest passenger train is Shatabdi Express between Bhopal and Kanpur with an average speed of 140 km. Isn’t this well below the speed of fast trains the Railway Minister vowed to introduce after visiting countries where such trains operate? There are some unanswered questions even today. Why is the average turnaround time of wagons are still so high despite slashing of the free time and like in demurrage? Why are more diesel locomotives proposed to be acquired despite the announcement to go for electrification of more routes?

It is good to know that issues such as port connectivity and elbowing of lines will receive a good deal of attention. But then one couldn’t be sure of the outcome of such an initiative if the issue is left of Rail Vikas Nigam Ltd to handle. There are instances where the port connectivity and doubling projects have made little progress because RVNL is not convinced of their viability. The real problems facing the Railways are an acute con­gestion on certain busy freight routes and chronic shortage of locomotives. These prob­lems have not been addressed in the Budget.



Railways Minister proposes to upgrade infrastructure at an estimated investment of Rs 75,000 crore in the next seven years. Where is the money going to come from ? If the Railways wants bigger private participation, it will perhaps have to take a re-look at its present public- private partnership model. Correct policies to attract private investments are needed. Sadly, the Rail Budget lacks such policy initiatives. What has happened to the dedicated rail freight corridor? We have been hearing about this corroder for the past three years. Prime Minister had laid the foundation stone for this project way back in September/ October 2006 in Mumbai and Ludhiana. Has a single brick been laid so far ? We have been hearing about the plans to convert New Delhi Station into a world-class station. But nothing has been done so far to execute this project. If this pace of work continues, can we expect the work to be completed before the Commonwealth Games?

Railways Minister has made a number of announcements relating to new trains, low­ering the train fare etc On a careful study, one finds that a number of New trains can only ply after around 7 to 8 years because tracks are not there and in many places gauge conversion is necessary, which may take years. I wll give one example which is very glaring. It is announcement of running a new passenger train from Hajipur to Phulberia. This Phulberia is a wellknown place because of the Railways Minister. But a passenger train can only ply after new track is laid. Can it be done in the ensuing financial year? Will this passenger train ply in 2008-09? I leave it to your wisdom. Similarly there are a dozen of new trains that are announced by Railway Minister which can ply only after tracks are converted from Narrow gauze to Broad Gauze.

Next is the most interesting part relating to lowering the passenger fare. A general impression amongst the public is that henceforward train fare will become cheaper. But is it so? This fare reduction has come with certain conditions. It is applicable only on Sleeper Class, AC Chair Car and 3 Tier where the reduction will be 2 percent provided the passengers travel in the newly designed high capacity compartments. I tried to find out what are these high capacity compartments. Today, normal Sleeper Class compartments have 72 Berths, the high capacity will have 84. AC 3 Tier has 64 and it will be enhanced to 72. AC chair car has 67 and it will increase to 102. Railways Minister has announced that new compartments are being manufactured. Those which have been sent for repair, will also come, he has said. But from close quarters of Rail Bhawan, it is learnt that, at present only 225 newly designed high capacity compartments are available. It will take not less than 7 to 8 years to convert all compartments to high capacity. Should we believe that the passengers have to wait till then?

The other announcement is relating to reduction of ticket-fare in some "popular" trains during peak hour. There are nearly 1600 Mail and Express trains plying in our country out of which 400 are considered, "Popular", I do not know in what category. It is very cumber­some to implement this, no doubt, but the general impression has been created through the Budget speech that train fare has been slashed though it is seasonal. Very strange are the ways of the Railways Minister. Strange indeed!

At its juncture I must raise certain issues for the considerable of the Railway Minister. It relates to Freedom Fighters. Since 70s, Freedom Fighters are provided with free rail travel pass for which Ministry of Home Affairs had deposited the money. The number of Freedom Fighters are quite less today in comparison to that of 70s or 80s. I have been appealing time and again that the restriction of travel in Super Fast Trains like Shatabdi, Jana Shatabdi and Rajdhani should go. They are old and infirm and very few of them actually travel. Why can’t you provide them a little comfort. They donot seek priority in reservation. Allow them these superfast train travel only when vacancy is available.



I take this opportunity to reiterate again that for the speedy development of infrastruc­ture in Orissa, Indian Railways should provide a package which includes allocation of funds for ongoing projects, sanction of new lines, introduction of new trains, extension and increase in frequency of mail/ express trains, and improve passenger amenities. There is an urgent need to complete Daitary-Banspani BG rail link and introduce coaching services in this sector. Rail link costruction work between Bhawanipatna to Junagarh should start immediately. There is a demand to extend Naupada-Gunupur BG rail link to Thiruvali which would enable increase in cargo generation at Gopalpur port. Two projects, such as Khurda Road-Bolangir and Haridaspur-Paradeep proposed rail link is progress­ing at a very slow pace. In these new rail lines the rate of return is high, yet I fail to under­stand why Railway is not allocating funds for completion of these two projects in a time bound manner.

The survey report of Talcher-Gopalpur Broad gauze rail-link is before the Ministry which has indicated a favourable rate of return. The recent thrust of industrialisation in Orissa with setting up of Steel, Power and Aluminium Plants would require a dedicated railway link between Talcher to Gopalpur for export and import of raw materials and finished products. However, I must thank Railway Minister for starting 4 new trains and increasing the frequency of Rajdhani Express. The new train connecting Allahabad to Sambalpur was a long pending demand which has been adhered to. I would urge upon the Minister to con­sider starting a new Express train from Paradeep to Mumbai which would connect the east-coast to the western shores of our country. In this Budget, attempt has been made to recognise the problem of unmanned level crossing and congestion at busy level crossing which needs Road over bridge. Two such Road overbridge are essential in and around Cuttack now. One at Gopalpur and another at Kapilash Road-Tangi. Necessary steps may be taken to include these two projects in this years Budget.

As large parts of Orissa are being developed by East Coast Zone, the functioning of this Zone is of great interest to us. It was after long fight that this zone was created. Our impression was that it would be full fledged by now in its 10 years of existence. But that is not so. I will give you instances. In 2007-08, Sambalpur-Titlagarh and Titlagarh-Raipur Doubling project was listed. Asian Development Bank was supposed to finance this Rs.1680 cr project. Last year provision of Rs.10 Crore was made. The technical survey and de­tailed estimate was done by East Coast Railway and after that tender was floated. The area comes under East Coast Railway Zone. But Railway Vikash Nigam didn’t entrust these job to the project implementation unit of East Coast Railways but was given one to Kolkata and another to Bilashpur Project implementation unit. Why this has been done? There has been cost escalation of high order. Almost double the amount of the project cost. Will the Minister look into it? Also appraise us the reason why the jobs were taken away from East Coast Zone.

Before I conclude, I must say that Railway Minister’s performance as the Railway Minister in the past five years has been impressive in the sense that he presented five budgets in a row, all surpluses and has succeeded in projecting Indian Railways as one of the high performers. But would it not also be in order to have a performance assessment of how many of the promises made in the earlier Budgets have actually been delivered upon. What needs to be remembered is that, despite impressive strides in recent years on the financial and safety fronts, when compared to major world railways, the Indian Railways has a very long way to go in terms of quality of service and productivity. There are tremendous challenges to be overcome. Therefore, there is no room for compla­cency or misplaced munificence.

 (ends)

 



1402 hours

*SHRI BRAHMANANDA PANDA (JAGATSINGHPUR): Hon’ble Speaker Sir, I  thank you for giving me this opportunity to speak on the Railway Budget of 2008-2009.  The Railway Budget is like a milestone in the progress of a nation.  It’s a reflection on the unity, integrity and diversity of our huge country.  Railway is the unifying force in this country.

          This House has witnessed discussions regarding the welfare of our population, especially of the deprived section the labours, the farmers and the working class.  Everybody cutting across party lines expresses sympathy, but sometimes it remains a mere lip service.

          Sir, India is a land of diversity with many languages, religions, castes and creeds.  I come for the holy land of Lord Jagannath who is a symbol of secularism.  He had a devotee named Salabega who was a muslim and a devotee named ‘Dasia’ who was from the Dalit community.  In this context sir, when I rise to speak my heart pines for my people.  Wheneven any national leader visit my state they all highlight the poverty, squalour and the deprivation of my people.  Orissa is famous as a backward, poverty-stricken state.

          In the recent past Orissa has had some distinguished visitors like Mr. Sharad Pawar etc. Now Mr. Rahul Gandhi is on a tour to Orissa. He has expressed his anguish after witnessing the deprived state of Orissa’s poor-the Scheduled Caste and Scheduled Tribe community.  The sincerity of his sympathies is doubtful.

          Sir, you are a leader of the proletariat class and you stand for the interest of the proletariat class.  Hence I believe you will empathise with me and allow me to point out the flaws in the Railway Budget.  Sir, as far as safety and security of the passengers  are concerned, very  little  has  been  done  in this  regard.  A  Railway

 

*Original in Oriya.

 

passenger is subjected to loot, dacoity, accident as well as terrorism.  A person traveling by train is unsure of reaching his destination.  Hon’ble Railway Minister is speaking of modernization.  But I must provide a secured environment for railway passengers.  I applaud his steps which are taken to extend facilities to women and senior citizens.  I also hope that he will look at Orissa with a benevolent eye. Orissa is a backward state but not a poor state.  It is a beautiful land filled with natural resources,  minnerals, verdant forests and has a long coast line of 480 Kms. Visitors to Orissa get spellbound with the beauty of this land.  That is why our Chief Minister has written a letter to the Hon’ble Railway Minister to pay attention to the demands of Orissa, so that the Railway map of Orissa will change.  Orissa is now a favourite destination of industrial groups like POSCO, Arcellor Mittal and Vedanta etc.  Orissa needs to make giant strides to catch up with other states. Hence development of Railway infrastructure is very vital to the progress of Orissa.

MR. CHAIRMAN (SHRI VARKALA RADHAKRISHNAN): Hon. Member, please conclude now.

SHRI BRAHMANANDA PANDA (JAGATSINGHPUR): Sir, you must give me a considerable amount of time… (Interruptions)

MR. CHAIRMAN: That is what I have told you.  Or, somebody else may have to come here; I cannot be here.

SHRI BRAHMANANDA PANDA (JAGATSINGHPUR): In that case, I am not going to speak anything.

MR. CHAIRMAN:  Please conclude.

SHRI BRAHMANANDA PANDA (JAGATSINGHPUR): Mr. Chairman, Sir, you must allow me   a considerable amount of time to speak.



MR. CHAIRMAN:  You can give the remaining portion of your speech, in writing.  You may write any number of pages, and place it on the Table; it will be taken as recorded.

SHRI BRAHMANANDA PANDA (JAGATSINGHPUR): Sir, this is not fair. When I am here to speak   about my State, I should be allowed to speak.

MR. CHAIRMAN:  Whatever idea you have about the Railways, you may write an essay or even a book; you may place it on the Table; and it would be considered as recorded.  Please understand that we have time constraint.

SHRI BRAHMANANDA PANDA (JAGATSINGHPUR): Then, why these people are allowed to speak in the House. … (Interruptions) That is why Orissa has become a backward State.  I am here to speak about my State of Orissa.… (Interruptions)

MR. CHAIRMAN:  Even in the evening you would not be here, but I will have to be here till midnight.

          You may continue your speech. Try to conclude as early as possible.

*SHRI BRAHMANANDA PANDA (JAGATSINGHPUR) :          Sir, there are many projects which has been sanctioned by the Central Government but work is

yet to start.  There are some projects which remain unfinished  due to dearth of funds. With a  financial allocation the work can be completed.  The Langigarh and Junagarh railway line needs to be completed.  Members of the House Committee of Orissa Legislative Assembly and Chief Minister had met Hon’ble Railway Minister regarding this division.

          Likewise there is the Khurda road and Bolargir railway line which remains pending from a long time.  This is a tribal dominant area.  The people remain backward due to regional imbalance and negligence by the Central Government.  They remain cut off  from  the  mainstream.  That  is why ‘Naxalism’ is on the rise

 

 

*Original in Oriya.

here.  Repeatedly we have demanded in this August House that the Khurda-Bolargir Railway Project work should be speeded up but the vain. The Central Government in unnecessarily delaying the release of fund.  Similarly we have many on going projects like the Haridaspur-Paradeep railway line, Angul-Duburi railway line, Sukinda-Tarcher-Bimlagarh line, Rupsa-Bangiriposi and Nuapada-Gunupur  railway  line etc. which  await allocation of funds.  People of these areas are now indulging in Naxalism and Maoism etc.  There are also some railway projects where doubling and electrification of railway line is very essential like Daitari-Banspani railway line, Talcher-Sambalpur, Haridaspur-Paradeep railway line Koraput-Rayagada, Sambalpu-Talcher etc.  There are many projects which awaits survey.  We draw the attention of the Railway Minister to ensure an early survey.

          We demand introduction of new trains from Bhubaneswar to Koraput, from Jeypur to Malkangiri, from Bargarh-Nuapada, Berhampur, Phulbhani to Puri-Konark..

          Sir, the Konark temple is a world famous architectural marvel.  Gurudev Ravidra Nath Tagore had described as poetry on stone.  This beautiful place will attract more tourists if well-connected by Railway.  Sir Phulbani is a district of tribals.  Even after 60 years of independence the people of this area remain untouched by Railway.  They have neither seen a train nor a railway track.  Its is a very sad commentary on the state of affairs today. 

Sir, I would like to draw the attention of the Railway Minister to introduce some new super fast trains which will connect Orissa to New Delhi.  In Orissa there are trains without pantry-car facility for example the Heerakhand Exp, which plys between Bhubaneswar and Koraput.  Tribal districts of Orissa should be well-connected to New Delhi.

          Now I will speak about my own constituency, Jagatsinghpur which houses the famous Paradeep port.  It’s a milestone in our nation’s economic progress. It is the deepest natural port in the east coast.  Paradeep port earns revenue for the country.  However the full potential of this port is not being properly exploited because the doubling of railway bridge over river Mahanadi has not been done yet. Again Sir my constituency houses the shrine of Goddess Maa Sarala who is compared to Mata Vaishno Devi. But the place has no railway connectivity and hence tourists face difficulty.  The trains which ply between Paradeep to Bhubaneswar may be further extended to Puri. Sir we have been demanding for a long time  that Rajdhani Exp. should ply between Bhubaneswar and New Delhi on a daily basis.  That has not happened. Sir, I would like to draw you attention to Junagarh-  Ambaguda railway line and Kantabanjhi-Jeypur railway line which should be laid via Khariar and Nawarangpur.  Sir there areas have predominantly tribal population.  Laying down of railway lines will integrate them to the mainstream.  Our Chief Minister Shri Naveen Patnaik dreams of a economically strong vibrant and progressive Orissa.  His dreams can only be fulfilled if the Central Government and the Ministry of Railway in particular lends a helping hand. Funds should be provided to expedite the on-going projects.  The financial aid should come in a time-bound manner so that the projects can see the light of the day.  Sir I would conclude with a poem which was recited by Gopabandhu Das which describing the beauty of lake Chilka……

          “O’  train do stop here for a moment,

          I want to enjoy the splendour of a,

          Painting called Chilka”.

          Sir, I thank you for allowing me to speak on the Railway Budget.

Jai Jagannatha.

(ends)

*SHRI BRAJA KISHORE TRIPATHY (PURI): I bring to the kind notice of Hon’ble Minister of Railways through you for allotment of additional funds for Orissa in the budget for expediting the ongoing Railway project in the State and inclusion of new projects in the Railway Budget 2008-2009 which have not been covered in the present Budget.

Hon’ble Speaker Sir, as in the past, Orissa which is ranked much below the national average in the Railway Map of India, has been discriminated upon and also neglected in the allotment of funds in the present Railway Budget even though the East Coast Railway and portion of South Eastern Railway which pass through the state of Orissa are measure revenue earners for the Indian Railway. This is an unbalanced Budget which has not catered to the need of regional requirement and prospective Railway expanding Zone. Whereas captive thermal power plant have been proposed in the state off Bihar, new coach factory in Kerala, Wagon reconstruction in 6arkha in Chapra Distt of Bihar, allotment of Rs.200 crore for modernisation of railway workshop in West Bengal and allotment of Rs.80 crore at Jamalpur, no new project worth substance has been introduced in Orissa. No allotment has been made for the introduction of new projects in Orissa.

I thank through you to the Hon’ble Railway Minister for introducing a Garib Rath from Ranchi to Bhubaneswar in the last Railway Budget but Sir, this is not sufficient. I would request through you to the Hon’ble Railway Minister for more Trains from Puri-Bhubaneswar to New Delhi and Mumbai in the greater public interest.

Electrification:

Hon’ble Speaker Sir, in the present Railway Budget no provision has been made for Rail Line Electrification in Orissa whereas during 11th Five Year Plan proposal for Electrification of 3500 kms of Railway Line has been made. During last Railway Budget 2007-08, I had requested through you to Hon’ble Railway Minister for allotment of Rs. 100/- crore for the Electrification of the feeder links viz*. Daitari-Banspani B.G. Link, Talcher-Sambalpur-Jharsuguda B.G. Link and Haridaspur-Paradeep B.G. Link. However, sufficient funds have

 

* Laid on the Table.



not been allotted in the present Budget also. I would also request to the Hon’ble Railway Minister through you for allotment of sufficient funds for these projects and alongwith, Koraput-Rayagarh electrification project may be sanctioned in the Railway Budget-2008-09. Against the demand for electrification of Khargpur-Nimapura-Bhubaneswar and Bhubaneswar-Kottavelasha (RVNL) only Rupess^2 crore and^l crore has been sanctioned respectively in the Budget 2007-08 against the demand for Rupees 50 crore. Hence, the allotment may be increased to 50 crore in the Budget 2008-09.

Gauge Conversion

Hon’ble Speaker Sir, I would request through you to Hon’ble Railway Minister to increase the amount for expediting the gauge conversion from Rupsa to Bangiriposi which is very important as it was envisaged as an alternate to 3rd line between Kharagpur and Tatanagar and made into 2 phases, the first phase a gauge conversion of Rpusa-Bangiriposi and phase-2 connecting Bangiriposi with either Gorumahisani or Dollbhumgarh, which will subsequently connect to Tatanagar thereby reducing substantial distance. The allotment may be increased as the sanctioned amount of Rs.40/- crore is not sufficient for this project. Nuapara-Gunupur route gauge conversion may be expedited and extension to be made upto Therubali and also sanction is needed to provide connectivity to Gopalpur Port. Allotment of Rs.10.41 crore in the present Budget 2008-09 is not sufficient and I would request Hon’ble Railway Minister through you for increase this amount to Rs.75/- crore. Although broad gauge line of 2300 kms will be completed during 2007-08 and 3500 during 2008-09, no substantial allotment has been made for the state of Orissa.

On Going New Lines

Hon’ble Speaker Sir, Lanjigarh Road-Junagarh B.G. Rail Link:-Sir, this project was sanctioned in the year 1993-94. Rs.100 crores was demanded for commissioning the section between Lanjigarh Road-Bhawanipatana and commencement of land acquisition from Bhawanipatana to Junagarh. The Govt, of Orissa had demanded Rs.120/- crore for the project, however only Rs. 34/- crore has been allotted in the present Budge which may be increased to Rs.75/- crore.



Haridaspur-Paradip B.G. Link‘-Hon’ble Speaker Sir, only Rs.80/- crores has been allotted in the present Budget for Haridaspur-Paradip B.G. Link in the Budget, however the state Govt, had demanded Rs.175/- crore. I would request the Hon’ble Railway Minister through you that the allotment may be increased to Rs.175/- crore.

Khurda Road-Bolongir B.G. Link:-Hon’ble Speaker Sir, only Rs.32.43/- crore has been allotted in the present Budget whereas the state Govt, had demanded

Rs.150/- crore.   I would request the Hon’ble Railway Minister through you that the allotment may be increased to Rs.150/- crore.

Angul-Dubri-Sukinda Road B.G. Link: This Project was sanctioned in the year 1997-98. This rail link is critical for the steel industries since it will be a feeder link for transportation of coal to the industries in the Dubri area and iron ore to the industries in the districts of Cuttack, Dhenkanal and Jharsuguda. The allotment of Rs.60/- crore is meager and may be increased to Rs.150/- crore.

Talcher-BimlaqQrh (154 KmsVThis Project has been sanctioned in the year 2004-05. The state Govt, had demanded Rs.75/- crore whereas Rs.10/- has been allotted. I would request the Hon’ble Railway Minister through you that the allotment may be increased to Rs.75/- crore.

Doubling of Existing Railway Lines: Hon’ble Speaker Sir, I request the Hon’ble Railway Minister through you for provisioning adequate funds for doubling of various Railway links in the state of Orissa. Particularly, I request the Hon’ble Railway Minister through you to increase the allotment for Doubling of Khurda Road-Puri Railway Line from Rs.2/- crore to Rs.50/- crore including the sanction of second phase work for which survey work was sanctioned in the last Budget 2007-08 . This railway line is more then 100 years old and eight years of first phase work for doubling should be expedited in view of the importance of Puri as an international Tourism point.



Hon’ble Speaker Sir, I request through you to Hon’ble Railway Minister to include the following proposals for survey for new lines in the Budge of 2008-09 :-

Conversion & Extension of Nuapada-Gunupur B.G. Rail Link to Theruvali (79 Kms.)

a. Traffic survey was made in March, 1999 for extension of the converted Nuapada-Gunupur B.G. Rail Link to Theruvali with a favourable rate of return. This extension will immensely benefit flow of import and export of cargo via-Gopalpur Port.

 b.         Jeypore-Malkangiri (117 Kms.).

This broad-gauge rail link for which a survey report has been submitted to Ministry of Railways forms a part of the most backward districts of Orissa i.e. KBK area, which has been accorded special status by Government of India for speedy development. This requires immediate implementation.

c.         Talcher-Gopalpur (245 Kms)

The survey report of Talcher-Gopalpur Broad-gauge Rail Link line submitted to Ministry of Railways indicated a favourable rate of return. The recent thrust of industrialization with setting up a of Steel, Power and Aluminum Plants would require a dedicated Railway link between Talcher to Gopalpur (Special Economic Zone) for export and import of raw material and finished products.

d)         Bargarh-Nuapada-Vio-Padmapur (120 Kms):

Survey for this Broad-gauge Rail link was completed with a viable rate of return 18.32% and report submitted to the Ministry of Railways. Rail infrastructure in Western Orissa is not developed adequately despite a large number of industries are existing and heavy production of food grains are achieved. This B.G. Rail link will traverse through acutely backward areas of the State, and will ensure economic development.

e)      Puri-Konark (35 Kms.) : Puri attracts thousands of pilgrims due to temple of
Lord Jagannath. The famous Sun Temple is located at Konark. This monument
is famous throughout the world and thronged by visitors from domestic and
abroad. Considering these a survey was completed for construction of New
B.G. Rail Link between Puri-konark in the year 1997. This link will facilitate
visits by the tourists and pilgrims to the last link of the golden triangle.

For Bargarh-Nuapada-Via-Padmapur (120 Kms) and Puri-Konark (35 Kms.) though for detailed survey has been announced in principle , r\o steps have been taken in this regard so far for sanction and construction and now also no funds have been allocated in the Current Budget for these two projects. Hence necessary sanction may be accorded for these projects in the Budge of 2008-09

 (f)      Gopalpur-Rayaqada (282 Kms) :

all Bauxite deposits are located in Rayagada and Kalahandi area. Recently, Government of Orissa has signed number of Memorandums of understanding (MOU) for setting up of Aluminium industries for production of Alumina and Aluminium. Sanction for a survey is imperative to cater to the traffic that will be generated.

(g)      Jaleswar-Digha (40 Kms):

Digha is a popular beach resort, which will be connected from Tamluk. It is necessary that a survey be sanctioned from Jaleswar to Digha a stretch of 40 Kms. so that the vast areas in Bhogarai and Jaleswar Block can be connected. Although this project has been announced, no funds have been allocated so far.

(h)     Jajpur Keonjhar Road-Jajpur (30 Kms.):

Biraja Khetra at jajpur Town is a famous place of Piligrimage in India at Par with Dwaraka and Kasi. A large number of pilgrims visit this area regularly. The Ministry of Railways is requested to sanction a survey for extension of the East Coast Railway line from Jajpur-Keonjhar Road to Jajpur.

(i)      Sorumahisani To Buramara (35 Kms.)

Work is in progress for gauge conversion of Rupsa-Bangiriposi N.G. Rail Link. A survey may be sanctioned for linking Gorumahisani on Tata-Badamapahar B.6. Rail Link to Buramara on Rupsa-Bangiriposi Rail Link.

(j)      Badampahar To Keonjhar (70 Kms.)

A survey needs to be sanctioned between Badamapahar to keonjhar which shall link the rich iron ore area with Tatanagar.

(k)      Sambalpur-Berhampur via Birmaharajpur (408 Kms.)

Presently a direct rail link from Western to Southern Orissa is not available. Transportation of goods and passengers have to move in a circuitous way via Raipur-Vizainagaram or the East Coast Rail Link.

 (I)      Bolanqir-Nawapara (159 Kms.)

Bolangir and Nawapara are extremely backward district of Orissa, covered under the KBK districts, which has been accorded special status by Government of India. Availability of Railway infrastructure shall lead to economic growth.

(m)     Banspani-Bimlaqarh (80 Kms.)

Keonjhar and Sundargarh districts are iron ore hub of Orissa. With rapid industrialization a network of railway links shall cater to the transportation requirement of that area.

(n)      Berhampur to Phulbani (169.8 Kms.)

A preliminary Engineering-Cum Traffic Survey was conducted in 2003. Phulbani is one of the extremely backward districts of Orissa, though endowed with large deposits of Granite, Graphite, Quartz, Manganese and Bauxite. Sanction of requisite funds may be made for commencement and completion the project.

The following extension and introduction of New Trains may be introduced.

Hon’ble Speaker Sir, I would like to thank the Hon’ble Railway Minister through you for extension and introduction of New Trains, viz, Bhubaneswar-Mumbai vida Sambalpur (bi-weekly), Puri-Darabhangha Express (Weekly), Paradeep-Bhubaneswar Express (Daily in lieu of Parradeep-Cuttack Passenger), Kendujhargarh-Puri Express (Daily). However, the Paradeep -Bhubaneswar Express may be extended upto Puri considering it as a Pilgrimage Centre.

The following introduction and extension of trains requires attention :

Super-fast Express from Sambalpur to Allahabad:

There is no direct train from Sambalpur to Allahabad in order to meet the growing demand of traffic from Western Orissa. To enable the people of Western Orissa to Visit important places of pilgrimage like Allhabad, the extended train No.8611/8612 may be further extended upto Allhabad.

 

Inter City Express between Koraput and Rourkela Via-Rayagada.

The Raipur-Vizianagram-Koraput-Kirandul B.G. rail link passes through the most backward areas of the State like Koraput-Bolangir and Sundargarh. An Inter City Express linking Rourkela with these areas of this State will give the much needed impetus for business and commerce of the area.

Express Train from Titilagarh to Puri, Via-Sambalpur:

Presently there is no direct train from Titilagarh area to cater the needs of Western Orissa. Introduction of Express Train on this route will provide relief to the people and also ensure emotional, social integration with costal Orissa.

Express Train from Visakhapatnam to Howrah-Titilagarh, Raipur & Bilaspur:

The area from Visakhapatnam to Titlagarh is backward and requires additional train services to ensure increase of commerce and trading with neighboring States.

New Puri-Hyderabad Express and and New Puri-Chennai Express

There is no direct Train Link from pilgrim centre of Puri famous for Lord Jagannath to South India. Two direct trains from Puri-Hyaderabad and Puri-Chennai will fabulously benefit pilgrims of South India and people of Puri and Orissa.

Express Train between Baripada and Visakhapatnam Via Balasore,  Bhubaneswar and Berhampur.

Baripada the district Headquarters of Mayurbhanj is now connected on the Board gauge system of Indian Railways. It is necessary to provide a direct link with Southern Orissa as of the Passenger amenities.

Express Train from Gandhidham to Puri.

Orissa continues to provide human resources for industries in Gujurat. A large number of Oriyas are working in various part of Gujrat. An express train may be provided from Puri to Gandhidham via Vizainagram.



Express Train from Keonjhar to Howrah

Keonjhar district has been connected in the Daitari-Banspani BG Rail link. A large number of the tribal population shall use the direct link for trade and commerce.

Super-fast Express from Puri-Jaipur:

There is no direct train service from Puri Orissa) to pink city of Jaipur (Rajasthan). Introduction of a Train Services from Puri-Jaipur, Via-Sambalpur, and Raipur will enable tourists and pilgrims from Central and Western India to come to Orissa and this service will immensely benefit people of western Orissa.

Express Train from Barbil to Vishakapatnam via-Kenojhor & Bhubaneswar

The BG rail link between Banspani-Daitari is expected to be commissioned very soon. Keonjhar and Jajpur districts are undergoing rapid industrialization. Introduction of a train from Barbil to Vishakapatnam will facilitate movement of passengers and shall also be used for trade and commerce.

Express Train from Baripada to Howrah

Narrow gauge section between Rupsa to Baripada has been converted and commissioned. In order to strengthen the traditional link of the people of Mayurbhanj district with West Bengal and meet the aspirations of the people of that district, Ministry of Railways is requested for introduction of an express train from Baripada to Howrah.

Intercity Express Between Jharsuguda and Bhubaneswar

The industrial scenario is fast changing with the large number of steel plants located in Jharsuguda and Sambalpur districts. Inadequate train services is a serious impediment for people of that area. Ministry of Railways is requested for introduction of an Inter-city Express between Jharsuguda and Bhubaneswar.

Super fast Express between Rourkela to New Delhi.

The industrial and mining area of Sundargarh and Jharsuguda district are sparsely connected to New Delhi. Introduction of a direct train will be immensely popular facilitating travel of passengers from these districts.



Direct Train between Bhubaneswar-Chandiqarh-Kalka

A large number of people of Orissa are employed in defence services and allied sectors in Himachal Pradesh, Haryana and Punjab. A super fast express may be introduced from Bhubneswar to Chandigarh, which will also encourage tourism between Orissa and Himachal Pradesh.

Raiqarh-Gondia Intercity Express to Jharsuguda

Extension of this train shall provide a direct link from Vidarbha region to Western Orissa.

Bilaspur-Raiqarh passenger to Jharsuguda

Extension of this train will facilitate movement of passengers to a major part of Chattishgarh.

Extension of Janshatabdi Express between Howrah and Barbil to Keonjhar

Daitari-Banspani B6 rail link is expected to be commissioned very shortly. Keeping in view the aspirations of the people of Keonjhar and to facilitate connectivity for trade and commerce this train may be extended up to Keonjhar.

Amongst others, request was made for introduction of a Shatabdi Express from Puri to Paradeep. I would request Hon’ble Railway Minister through you to expedite and implement these passenger amenities.

Also the Garib Rath introduced between Bhubaneswar and Ranchi may be extended to Puri Jagannath Dham for the convenience of the tourists.

Introduction of EMU Services:

Hon’ble Speaker Sir, the electrification work between Kharagpur – Bhubaneswar is in progress and stretch of 200 kms between Palasa to Bhubaneswar has been commissioned. Ministry of Railways is requested to introduce fast Moving EMU Trains from Puri-Palasa and Puri-Balasore to cater to the need of passengers of Puri-Khurda Road-Bhubaneswar and Balasore. I would request to Hon’ble Railway Minister through you for introduction of these EMU Trains for the benefit of the passengers.



The Ministry of Railway has introduced an Express Train from Sambalpur to Raipur this may be extended to Puri as this will facilitate a direct link between the capitals of two States. I would also request you that existing Hirakund Express from Nizamuddin to Bhubaneswar which, has been extended up to Visakhapatnam considering its long distance, provision of pantry car may be made, introduction of Three tier AC and the frequency of the said Train should be increased from 3 days in a week to daily service. The Hirakund Express may be provided with more coaches in order to cater to the requirement of passengers from Palasa, Berhampur, Chhatrapur and Balugaon.

Visakhapatnam-Nizamuddin Express Train may be increased from three days to daily in a week to cater the need of passengers traveling from Western Orissa to the capital of India. The frequency of New Delhi-Bhubaneswar Rajdhani Express may be increased from 4 days to 7 days in week and these three days the Rajdhani Express may run Via-Samabalpur, Rourkela and Ranchi. The frequency of Puri-Ahmedabad Express Via-Sambalpur and Vizianagaram may be increased to facilitate journey of large number of workers from Orissa employed in Gujrat. It is requested that the frequency of this train Via-Sambalpur may be increased to thrice a week and via-Vizianagarm to four days in a week. The frequency of Bhubaneswar-Kurla Express may be increased to three days in week. This train is immensely popular by passengers traveling from Western Orissa. Frequency of Puri – Tirupati Express may be increased to daily service and the time span may be reduced from 28 hrs to 24 hrs in the interest of general public . Since large number of fishermen folk are visiting Puri and have business connections, the Puri-Tirupati Express may be having an additional stoppage at ‘Tuni’ Railway Station under South Central Railway. Coramondal Express may be stopped at "Guddur station" for the convenience of general public.

Establishment of passenger halt at Indrayumna, Puri.

Request was made to Railway Ministry that a passenger halt at Indradyumna near Puri under Khurda Road Division may be established. The Railways had conducted a survey and asked for certain information. Necessary information has been provided to the Railways since long and the proposal is a financially viable one, however, no progress has been made so far in this regard. The necessary of sanction for establishment of a passenger halt at Indradyumna may be accorded in the budget 2008-09.



Passenger amenities:

Hon’ble Speaker Sir, Ministry of Railways was requested for increase in passenger amenities for Orissa as with the creation of East Coast Railway and with establishment of its Headquarters in Bhubaneswar the expectation and aspiration of people of Orissa for better infrastructural developments of the stations has been increased. The Ministry of Railways was requested to improve passenger amenities at Puri, Titlagarh, Rayagarha, Raigarha, Koraput, Kessinga, Chattrapur, Balugaon, Jaleswar and Balangir Stations. The Ministry is also requested to further increase computerized network for reservation at Kuhudi, Kalupadaghat and Chhatrapur of Orissa. Though PRS-cum-UTS has been sanctioned for Sakhigopal, Khariar Road and Soro stations, this has not been made operational. This may kindly be expedited. Janakideipur Railway Station under Khurda Division may be developed as a full-fledged Railway Station to cater for a large chunk of people. The 214 down and 213 up Puri- Cuttack passenger train, the only train which is helping the service holders and daily commuter may be provided with additional coaches as the number of commuters have increased causing immense difficulty to the daily passengers.

Introduction of Pantry Car.

Some long distance trains originating from Bhubaneswar-Puri are not provided with Pantry Services. Ministry of Railways is requested that pantry car services for Bhubaneswar-Bangalore Express (8415/8416). Bhubaneswar-Kurla Express 1045/1046 and Puri-Tirupati Express (8439/8440) may be provided. Necessary provision for funds in this regard may be made in the in Budget 2008-09.

Coaching Terminals:

Hon’ble Speaker Sir, Orissa has only one coaching terminal at Bhubaneswar, which is land locked and inhibits expansion. This terminal should be expanded in order to accommodate more number of Trains. The Coaching Terminal at Puri has been closed. Hon’ble Speaker Sir, I would request to Hon’ble Railway Minister through you for setting up of coaching terminals with revival of one at Puri and in order to accommodate more number of trains. Proper coaching terminals may be developed at Berhampur, Sambalpur and Koraput also.



Hon’ble Speaker Sir, I would request the Hon’ble Railway Minister through you to kindly substantially increase from the present allotment in the Railway Budget 2008-09 for completion of ongoing railway projects in the State of Orissa which will fulfill the expectation and aspiration of the people of Orissa and culminate in economic growth and prosperity of the State.

 

 

(ends)

1735 hours

SHRI ARJUN SETHI (BHADRAK): Thank you, Sir.  I would confine my speech to a few specific problems as the time at my disposal is very limited.

I would like to bring to your notice as well as to the notice of the hon. Minister present here that last year in the Railway Budget two specific projects were sanctioned for the State of Orissa; Sambalpur-Titlagarh and Titlagarh-Raipur.  It was also envisaged that these will be taken up by the Rail Vikas Nigam. These projects come under East-Coast Railway.  As you know, Sir, the East-Coast Railway was approved by the Ministry of Railways after a long struggle by the State Government as well as by the people of Orissa.

 I would like to bring to your notice a specific action of RVNL by which they have tried to divert the execution of these two projects.  All the pre-requisite action, like the survey and the detailed project report, have been taken by the East-Coast Railway.  But now the RVNL has written a letter – the General Manager PI-1 has written a letter to the Additional General Manager RVNL, Bilaspur – that the execution of Sambalpur-Titlagarh doubling will be done by Kolkata and Raipur-Titlagarh work will be executed by Bilaspur division.  This is how the Railway administration, Railway Ministry as also the Railway Board have tried to cripple the work of East-Coast Railways.  These two particular lines come under the jurisdiction of East-Coast Railways, Bhubaneswar which has also undertaken the preliminary work like survey and DPR.  If I am permitted, I would like to quote his name.  General Manager PI-1 has written a letter to the Additional General Manager, RVNL, Bilaspur that these two projects will be executed by Kolkata, that is South-Eastern Railway and also by the South-East Central Railway, whose headquarter is at Bilaspur.  This is the case of utter negligence on the part of the Railway Ministry.  When these two projects come under the jurisdiction of East-Coast Railway how can they be executed by the South-Eastern Railway and the South-East Central Railway?  This is certainly an action on the part of the Railway Ministry to neglect the State of Orissa and to cripple the working of the East-Coast Railway at Bhubaneswar.  How can this particular gentleman write a letter saying that this particular work will be executed by Railways other than the East-Coast Railway?[R119] 

(z3/1740/rc/cp)[R120] 

          Another thing I would like to bring to your kind notice.  Last year, a sum of Rs.680 crore was sanctioned.  You will be surprised to know that a report has come in the newspaper of Delhi saying that only Rs.385 crore has been spent and the remaining Rs.283 crore will be diverted.  This is the case of utter negligence on the part of the Railways and discrimination against the State of Orissa.  Fortunately, the Railway Minister, hon. Shri Lalu Prasadji is here.  I would like to draw his attention to this point.  He should clarify this point.

          Another point I would like to bring to the notice of the hon. Minister.  The East Coast Railway Zone was sanctioned when the NDA was in power and Shri Nitish Kumar was the Railway Minister.

THE MINISTER OF RAILWAYS (SHRI LALU PRASAD): Please give me a copy of the sanction letter.

SHRI ARJUN SETHI (BHADRAK): Which sanction letter?

रेल मंत्री (श्री लालू प्रसाद)  :  जोन सैंक्शन का लेटर मुझे दिखाइए।  …(व्यवधान) आप हाउस में बोल रहे हैं कि जोन सैंक्शन हुआ था, तो आप उसका सैंक्शन लेटर दिखाइए। …(व्यवधान) आप मिसलीड मत करिए।

SHRI ARJUN SETHI (BHADRAK): The sanction letter must be with the Ministry of Railways.  How can I have that sanction letter?  Everybody knows including this hon. House that this particular zone was sanctioned during the NDA regime… (Interruptions).  He is at the helm of affairs.  He can find it.… (Interruptions)

SHRI LALU PRASAD:  You put up that letter and I will implement it.

SHRI ARJUN SETHI (BHADRAK): Sir, I am a Member of this House.   How can I go into his Ministry and find out the letter?… (Interruptions)

श्री लालू प्रसाद  : अगर हम नहीं देते, तो आरटीआई से ले लीजिए।

SHRI BRAJA KISHORE TRIPATHY (PURI): At that time, it was announced in the speech of the Railway Minister.  Now you have also delivered your speech and made some announcements.  So, should we not believe you?

श्री लालू प्रसाद :  आप हमें दीजिए।

श्री बृज किशोर त्रिपाठी (पुरी) : रेलवे मिनिस्टर की स्पीच में है।

SHRI ARJUN SETHI (BHADRAK):  Sir, I will be very thankful to the hon. Minister of Railways if he places a copy of the sanctioned letter on the Table of the House so that everybody could know when it was sanctioned.  What is the harm in it?… (Interruptions)

MR. CHAIRMAN (DR. LAXMINARAYAN PANDEYA): Please conclude now.

SHRI ARJUN SETHI (BHADRAK): Sir, the East Coast Railway was sanctioned after much persuasion, demand and also much labour both by the Members of Parliament and also people outside.  So, I would request the Railway Minister to see that this particular Railway gets activated fully.  Sir, I can place a copy of the letter written by the Rail Vikas Nigam.  If you allow me to place it on the Table, I would place it.

MR. CHAIRMAN:  You can give it to the hon. Minister.

SHRI ARJUN SETHI (BHADRAK):  All right.  I will hand it over to the hon. Railway Minister.

श्री लालू प्रसाद  :  सैंक्शन लेटर भेज दीजिए।  

SHRI ARJUN SETHI (BHADRAK): The letter was issued by the General Manager, Rail Vikas Nigam.

MR. CHAIRMAN:  Please conclude.

SHRI ARJUN SETHI (BHADRAK): Sir, please give me only one minute.[R121] 

(a4/1745/snb-nsh)[R122] 

          Sir, my parliamentary constituency is Bhadrak. The Bhadrak station was declared as one of the model stations not only in the State of Orissa but also in the entire Railway stem. Today if anyone would visit that station any time, he would be surprised to see that there is not even platform shelter in the station. There is no lighting arrangements and also all other amenities that are supposed to be there are absent.

          One ROB was sanctioned for Orissa and it was assured by the hon. Minister of State for Railways that it would be completed and operationalised by February, 2008. Today we are in the month of March. So, I would like to request the hon. Minister to look into these matters and see to it that this ROB is sanctioned at the earliest.

          Thank you. 

(ends)

 

 

*DR. PRASANNA KUMAR PATASANI (BHUBANESWAR) :  Every year we are participating in Railway budget. Honourable Minister Laluji presently placed a  good budget but we are debarred of getting good sanction for our state of Orissa. Our own Chief Minister deputed one Committee of Representatives headed by Hon’ble Speaker and we had a nice meeting with Laluji in his own chamber. As per our demand, Laluji paid us a patient hearing and committed to allot more money to our state. According to all India ratio the money which is allotted by Minister is not sufficient. I don’t know most of the time we see whatever money that you are allotting in this budget your officials not utilizing properly. Therefore, most of the time the money is lost and you are diverting to other states. I have been requesting to allot a good sum of amount to Khurdha, Bolangir, new Railway line. Whatever the money you have allocated is not sufficient. And why it is delay of utilizing the last year money to be enquired by your august office. Kurdha Bolangir railway new line is linking in between western Orissa to eastern Orissa and western Orissa is quiet adjacent to your Bihar. If this railway line would be completed soon the people of Bihar may come to see Puri Lord Jagannath, the biggest world heritage Konark and Lingraja Mandir. In the world heritage consequently within 60 kms radius there are three world heritage situated in Orissa that is Konark, Lingaraja and Puri Jagannath temple. This is the only railway line in India which goes through downtrodden area of adivasi, harijan and girijan that is the most poorest area of the country that they don’t see the train since independence. To promote our state Orissa from below poverty line this railway linkage can promote the economical, commercial revenues of the country. There is another small railway line from Puri to Konark must be surveyed immediately to promote eco tourism. I demand repeatedly that there should be metro railway connecting Kurdha, Cuttack and Bhubaneswar immediately.

 

 

* Laid on the Table.



Sir, I am representing Bhubaneswar the cultural capital of India, that is the capital of our state to the Parliament. As a peoples’ representative, I have been demanding to make Bhubaneswar as a No.1 city in the country. Now in the IT sector and other scientific achievements which is done by the present government should not be ignored. To promote the city we need some more flyovers to be done immediately. In the 13th Lok Sabha you had only sanctioned i.e. Punama Gate according to my request. That is not yet completed. Rest of the gates those are located under east zone Mancheswar, Vir Surendra Sai Nagar, Satya Nagar, Sayed Nagar and another Bhubanesar station leading towards commercial market. Minister should pay personal attention to start this railway overbridge on priority basis to protect the lives of poor people. In every month they are getting accidents and deaths. To avoid this human tragedy a good sum of amount may please be allotted in this Supplementary budget. I have been requesting to you since long to construct one over bridge under Jatoni constituency ie. Near to Kurdha Rly. Junction. To save the lives of poor people those are leading a very miserable lives. That the railway bridge previously constructed in the British period may be collapsed at any time. To save the lives and property of local people I draw immediate attention to implement the project diverting the funds i.e unutilized in other states.

In the last government east coast zone is originated and not so progressed and the construction of building works is highly delayed. The headquarter office should be completed and I request the inaugural ceremony must be done by you before the elections and to this zone other ancillary materials and the improvement of works must be executed properly so that this should be best zone in the country.



And lastly in my submission my state Orissa is highly neglected relating to railway sector in the country. Suppose this year you have allotted about 30 crores to Kurdha-Bolangir the project needs more than 1000 crores and if this way the money would be sanctioned this will take another 50 years to complete the project. So I request please allot 300 crores altogether to start the work ahead. Other new line projects submitted by our most popular state government should be paid special attention by you.

 (ends)

*SHRI ANANTA NAYAK (KEONJHAR) : I rise to take part in the discussion on Railway Budget. Sir, Railway is the life line of the nation; it is the largest public sector undertaking. Now this PSU is earning profit and paying dividend every year. I thanks the Railway Minister to improve the financial condition of Railway. But we should not forget the employees at the grassroots, the worker the gangamen, the railway Staffs and last but not least the Railway Board also deserve thanks for paying dividend.

Railway is the largest transport system in the country. But the system needs connection with each and every State irrespective of the fact whether any areas are hilly, dense forest and inaccessible due to same reason. Even after 61 years of Independence people in some States have not yet seen Rail. So, Rail connectivity must be provided to such areas.

Development of infrastructure depends mainly on the rail connectivity. There are 12 major ports in the country. All the ports must be provided with rail connectivity. While presently the Rail Budget the Hon’ble Minister has referred to new train between Jaipur and Paradeep of course train services is available between Cuttack and Paradeep which is being extended to Bhubaneswar. I urge upon the Minster to connect Paradip Port with the hinterland, the Minister has announced new lines from Keonjhargarh to Badapaahad and Barbil to Barsuan. A loop line may be constructed between Keonjhargarh and Ganhdamardan sector. This will facilitate the transport of iron ore and other minerals to Paradeep Port for export purpose. The cost of opertion will also not much. Each line will give profit to Railway Department.

The Hon’ble Minister of Railways in kind enough to introduce Garib Rath to different States. But he is unkind to my State like Orissa. I request him to introduce  a Garib Rath  between  New Delhi and  Bhubneswar  connecting  my

 

 

* Laid on the Table.

Parliamentary constituency Keonjhar. I take this opportunity to thank him for introducing of new train between Keonjhargarh and Puri. That means the Hon’ble Minister has recognized the importance to mineral rich Keonjhar parliamentary Constituency. He has also increased the frequency of 2421/2422 Bhubaneswar via Tata Nagar. So we are having Radhani for 5 days in a week. I demand that a pair of Radhani Express may be introduced between New Delhi and Bhubaneswatr via Tatanagar and keonjhargarh. The people of the backward area which is very rich in minerals and developed industrially will be greatly benefited if this train is introduced we have got a large number of workers from the home State of Hon’ble Minister and also from West Bengal. So adequate train connection may be provided between Keonjhargarh, Patna and Kolkota. A large number of devotees visit Deogarh from my area. We will be grateful if the Hon’ble Minister considers a daily train from Keonjhargarh to Deoghar. The pilgrims will get direct connection to Babadham. This will promote tourism also.

Sir, coming to freight earning the undivided south Eastern Railways was earn highest amount of revenue from freight among all the Railway Division. After bifurcation the East Coast Railway has the highest revenue earner from freight on that basis I was demanding better treatment to Orissa from day one of my election as member of parliament. I belong to a Constituency which contributes maximum revenue to Railway by freight traffic. This freight earning will further increase one the line from Daitari and Banspani announced by the Minister. I appeal to Shri Lalu Prasadji to provide adequate fund for construction of additional line. This will facilitate the transport of Iron ore to Paradeep. India will get huge amount of foreign Exchange from the export of Mineral. In addition to Railway the National exchequer will be benefitted thereby.

Sir, there is an urgent need to modernize the Indian Railway. I am glad that the Hon’ble Railway Minister has taken steps in that direction .1 appeal the Railway Minister to give priority to modernize the signaling system and safety along with development of the security of the passengers. Passengers one boarded the train must reach their destination safely. The security must be provided in the long distance trains.

Sir, the Hon’ble Minister has sanctioned the doubling of some lines. As far as Orissa is concerned only a few kilometres from Jakhapura to Haridaspur, Paradeep to Bansapani, Barbil to Badampahad and Champajhar to bimlagarh have been mentioned in his speech. However i welcome the proposal for doubling Jhakapura-bansapani line.

Sir, the Minister has introduced a bi-weekly Express train between Bhubaneswar and Mumbai via Sambalpur. This train should be made a daily train. I take this opportunity to request the Minister to increase the frequency of Hirakhanda Express from tri-weekly to a daily train.

 

 



 



         Sir, the Rail Vikash Nigam Ltd., is doing very well. It should pay special attention to complete the ongoing projects in Orissa. The target date has been fixed to complete the gaudge conversion of Naupada-Gunupur. It is an old project lunched during British regime. It should be completed within the target date.

Sir, So far as the new projects are concerned a small Port in between Banspani and Jurdi has been selected. This should at least be completed upto Keonjhargarh in 2008-09.At the same time all possible efforts should be made to complete the proposed line between Banspani and Barbil. Besides proposal to construct some new projects like Bargarh to Padampur, Talcher to Gopalpur and Rupsa-Bangiriposhi-Gorumaihini and Badapahad to Keonjhargarh are pending with the Govt. I request the Railway Minister to extend financial support to these projects.

Sir,

So far as survey is concerned Banspani to Bimlagarh should be given priority.

Sir, I shall be failing in my duty if I donot drawn the attention of the Hon’ble Minister to remind him the urgent need to introduce the Express train from Keonjhargarh to Howrah and Barbil to Vishakapatnam via keonjhargarh and Bhubaneswar. I hope that the introduction of these new trains would be considered during the current financial year.



Sir, now the Kanasatabdi Express train is running from Howrah and Barbil. This should be extended to Keonjhargarh for which i have been demanding time and again.

Lastly, I would like to draw the attention of the Hon’ble Minister to the poor passenger amenities in the Railway Stations in Orissa. Except a few most of the stations do not have such facilities. Greater emphasis should be laid to provide passenger amenity in all these stations. Also demand that platform for Barbil station should be raised during this year. I thank the Railway Minister for considering the genuine demands of Keonjhar.

Thank you for giving me the opportunity to speak.

 

                                                                                                (ends)

2122 hours

SHRIMATI JHANSI LAKSHMI BOTCHA (BOBBILI): Hon. Chairman, Sir, I rise to support the historic Railway Budget for 2008-2009 presented by the hon. Railway Minister Shri Lalu Prasad Yadav.  

The Garib Rath train between Secunderabad-Visakhapatnam may be extended up to Rayagada Station to cover Bobbili parliamentary constituency, Parvathipuram parliamentary constituency in Andhra Pradesh and Koraput parliamentary constituency in Orissa. People of these constituencies would remain eternally grateful for this.

 

2339 hours

SHRI KHARABELA SWAIN (BALASORE): Mr. Chairman, Sir, I will confine my speech to only one point and that is about railway security. We have got the Railway Protection Force and we have got the Government Railway Police. Since law and order is a State subject, all the crimes committed inside the railway coaches or on the railway stations are dealt with by the GRP, and the RPF’s only job is to protect the railway property. As you know, all the unwanted police personnel of the State are sent to the GRP.[R224] 

(z6/2340/rs/jr)

[r225] Sometimes it is very strangely found that GRP files cases against the RPF personnel.  Now, the RPF organisation is being headed by an IPS officer who comes on deputation.  The DG, RPF, most of the time, does not have much of expertise on the functioning of the RPF.  He somehow enjoys a good time while in the Railways.

          My request to the hon. Railway Minister is that he should build up the RPF officers’ cadre.  The RPF officers are recruited through the Central services and they should not be held up at the DIG’s level for seven to eight years.  If they are given promotion early, there shall be continuity in the RPF cadre and the RPF cadre will be sustained and these officers, with their vast experience, can lead the RPF.

          I will also further request the hon. Prime Minister, through the hon. Railway Minister, that the Constitution should be amended to confer more law and order powers to the RPF personnel because the RPF personnel has got some accountability whereas the GRP has got none.  So, this is my point of preference to the hon. Railway Minister.

          I have got some small demands, which I shall, with your permission, lay on the Table of the House.

 

*Through you, I shall request the Hon’ble Railway Minister to implement the following railway projects in my constituency Balasore in Orissa.

(1)       Rail under bridge may be constructed at Tamulia Fatak level crossing
in between Balasore and Nilagiri Road Station of Kharagpur Division in S.E
Railways.

(2)              Road Under bridge also may be constructed at the Uttareswar level crossing near the western cabin of the Soro railway station in the KGP Division of S.E Railways.

(3)              A daily Fast passenger train may run in between Baripada-Howrah in the KGP Division of S.E. Rly.

(4)              The 203/204 Kharagpur-Bhubaneswar Fast Passenger should run via Cuttack instead of Naraj. This will reduce the running time of the train and it will connect a very important Station like Cuttack which is having the only Medical College of Eastern Orissa.

(5)              The goods shed of Balasore railway station in the KGP Division of SE Rly. should be provided with shed cover. The same platform also be concretised so that the goods are not thrown as the mud and dust.

(6)              The Puri -Okha Express train should run once a week via Balasore,
Kharagpur and Nagpur.

(ends)

 

Lalu announces more goodies, including more trains passing through Orissa, in the Parliament

ECOR, Railway Budget 2008, SER Comments Off on Lalu announces more goodies, including more trains passing through Orissa, in the Parliament

(Update: See http://pib.nic.in/release/release.asp?relid=39916 for the list of all the new goodies that were announced in the parliament debate after the initial Railway budget.)

The following is from pages 19-22 of a Rajya Sabha transcript http://164.100.47.5/newdebate/213/12032008/16.00pmTo17.00pm.pdf and the middle (about 45% past) of the Lok Sabha transcript http://164.100.24.209/newls/textofdebatedetail.aspx?sdate=03/11/2008. Only the Lok Sabha proceedings mentions the frequency.

  • Page 20 line 2 of the Rajya Sabha proceedings from top: Puri-Howrah Garib rath (biweekly)
  • Page 20 of the Rajya Sabha proceedings: Bhagalpur-Yeshvantpur Express (?) (weekly)
  • Page 21 line 1-2 of the Rajya Sabha proceedings: Extension of Biweekly 8509 Vizag-Nizamuddin express to Sambalpur via Titlagarh and Balangir. (This will connect Sambalpur, Titlagarh and Balangir to Hyderabad for the first time.)
  • Page 22 line 3 from top of the Rajya Sabha proceedings : New Railway line from Puri to Konark

(Note: See http://www.orissalinks.com/orissagrowth/?p=1192 for the other trains introduced in this budget.)

Orissa MPs statement in the Rajya Sabha on Railway matters

ECOR, Odisha MPs Comments Off on Orissa MPs statement in the Rajya Sabha on Railway matters

The following is from page 23-24 of http://164.100.47.5/newdebate/213/12032008/15.00pmTo16.00pm.pdf. on 12th March 2008.

MS. PRAMILA BOHIDAR (ORISSA): Sir, I would like to thank the hon. Railway Minister for having taken the step to grant free monthly tickets to girl students up to graduation level. Sir, the hon. Railway Minister has also taken a very welcome step to grant 50 per cent concession for railway travel to senior women citizens. Sir, I also express happiness for extending a train from Sambalpur to Banaras via Rourkela and Ranchi. But, this is only a half-hearted step. I had raised the demand for a direct train from Titlagarh or Sambalpur to Allahabad during the course of my speech in the last so many Railway Budgets. But, this has not been done. If this train is introduced, a lot of passengers of western Orissa, Chhattisgarh and Madhya Pradesh will be benefited.

Sir, I would like to draw the special attention of the Railway Minister to the different developmental grants given to Orissa, which are not sufficient. As Orissa is giving maximum revenue from valuable iron ore and mines, it is but natural for us to expect developmental work of railway system in interiors of Orissa. There is lack of railway link inside the adivasi areas and the newly developed industrial belt. These areas are to be well-connected with capital Bhubaneswar; otherwise, it will be very difficult to control immediately frequent naxalite attacks. Sir, the Orissa Government has presented demands for setting up of various projects, like wagon-making, electrical equipment making, factories at Bondamunda near Rourkela and Manchansuer near Bhubaneswar. But, these proposals have not been included in the Railway Budget. It is regrettable that these demands have not been fulfilled. Sir, our Chief Minister had raised a demand of Rs.1,330 crores, but the Budget has allocated only Rs.972 crores. Out of the above allocation, the major portion is meant for electrification and doubling of inter-State railway lines.

Sir, very less importance has been given to completion of on-going projects or construction of new railway lines. I would like to draw your attention to the fact that some of the railway projects, though sanctioned between 1993 and 1998, have not been completed till date for want of proper allocation of funds. These projects are mostly in tribal and naxalite areas. These areas have been neglected in this Budget. These on-going projects are: Daitari-Banspani; Lanjigarh-Junagarh; Khurda Road-Bolangir; Haridaspur-Paradeep; Angul-Dubri-Sukinda; Talcher-Bimalagarh; and Rupsa- Bangiriposi.

Sir, only some negligible amount of Rs.32.4 crores and Rs.35 crores have been provided to Khurda Road-Bolangir and Lanjigarh-Junagarh railway lines respectively, which will still remain incomplete. I request the Railway Minister that these projects should be completed early. Sir, the State Government has already submitted some proposals for incorporation in the current Budget, but it is regrettable that not a single project has been incorporated in this Budget.

Sir, I would also request the hon. Railway Minister to provide railway link to the naxalite affected areas, like Jaypore, Malkangiri, Naupada, Gunupur, Kandhamal, which are neglected for decades. Sir, I impress upon the hon. Railway Minister to consider the abovementioned proposals in greater interest of Orissa. Thank you, Sir. (Ends)

 

MP Sushila Tiria’s speech in Hindi on 11th March 2008 is at http://164.100.47.5/newdebate/213/11032008/14.00pmTo15.00pm.pdf (page 15-23) and page 1 of http://164.100.47.5/newdebate/213/11032008/15.00pmTo16.00pm.pdf.

Status of new berths in Paradip port

Jagatsinghpur, Paradeep port, Paradip - Jatadhari - Kujanga Comments Off on Status of new berths in Paradip port

Following is from http://pib.nic.in/release/release.asp?relid=36341.

As part of the on-going process of development, it is planned to construct Deep Draught Iron Ore Berth and Deep Draught Coal Berth at Paradip Port at a total estimated cost of Rs.892.60 crore. The projects are at tendering stage. Plan for Development of Southern Dock Complex at the Port is also at preliminary stage.

Chinese to help in the making of a world class station in Bhubaneswar?

Bhubaneswar- Cuttack- Puri, ECOR, Khordha, Railway network in Odisha, TOI, Economic Times Comments Off on Chinese to help in the making of a world class station in Bhubaneswar?

Following is an excerpt from a report in the Economic Times.

Railways may seek Chinese help in developing railway stations at Bhubaneswar and Bypanahalli in Bangalore.

A high-level Chinese delegation is visiting India from tomorrow to understand the Indian Railway system in a better way as part of the memorandum of understanding (MoU) signed between both the countries.

The 13-member delegation headed by Wu Wei, Director of Sino-India Railway Cooperation Working Group will visit Agra, Bhubaneswar, Mumbai and Bangalore during their 12-day visit.

… The two countries’ cooperation in rail sector is envisaged in the MoU signed on January 14 during Prime Minister Manmohan Singh’s visit to Beijing. The agreement, valid for three years, envisages development of rail-related programmes of mutual interest.

… The team would visit railway station at Bhubaneswar and Bypanahalli to explore the possibility of developing these stations at the international level. "After visiting these places, the team would share their views with us about the way to go ahead with the project, said the official.

Modernization of non-metro airports (including Bhubaneswar)

Bhubaneswar, Bhubaneswar- Cuttack- Puri, Khordha 1 Comment »

Following is from the PIB http://pib.nic.in/release/release.asp?relid=36250.

The Minister for Civil Aviation, Shri Praful Patel informed the Parliament today the target date for completion of modernization process of the 35 non-metro airports by the Airports Authority of India (AAI), is March 2010.

New Terminal Buildings expandable on modular basis are being constructed at Ahmedabad, Amritsar, Aurangabad, Agatti, Bhopal, Bhubaneswar, Chandigarh, Dehradun, Goa, Jaipur, Lucknow, Indore, Khajuraho, Madurai, Mangalore, Port Blair, Ranchi, Raipur, Rajkot, Trivandrum, Trichy, Udaipur, Varanasi and Vishakhapatnam airports. Modification/expansion of existing Terminal Buildings is being undertaken at airports in Agra, Agartala, Coimbatore, Dimapur, Guwahati, Imphal, Jammu, Nagpur, Patna, Pune and Vadodara.

Airside works including expansion and strengthening of runway for wide bodied aircraft operations, extension/new construction of Apron for more parking of aircrafts, link taxiways and parallel taxi tracks are being taken up at these airports as per requirement. At 24 of these airports, cityside development through Public Private Partnership is being undertaken. Bids for pre-qualification have been received for Amritsar and Udaipur airports.

Orissa asks for night landing facility in Bhubaneswar airport

Airports and air connectivity, Bhubaneswar, Bhubaneswar- Cuttack- Puri, Bringing International Connectivity, Jharsuguda Comments Off on Orissa asks for night landing facility in Bhubaneswar airport

Following is an excerpt from a report in Pioneer.

The Government has approached the Indian Airports Authority of India for night landing facilities at the Biju Patnaik Airport here. The IAAI authorities have assured that a Terminal Approach Radar would soon be installed which could enable night landing facilities. The night landing facilities would help the local hospitality industries occupancy rates, Mishra said. A proposal has been mooted for three more airports other than Bhubaneswar and Jharsuguda for improving connectivity.

Puri collector starts groundwork for the proposed port in Astaranga

Astaranga, Puri (Navayuga interested), Puri, Samaja (in Odia) Comments Off on Puri collector starts groundwork for the proposed port in Astaranga

Six-lane expressway between Bhubaneswar and Chandikhole to come up soon

Bhubaneswar- Cuttack- Puri, Bhubaneswar-Cuttack- Kalinganagar, Cuttack, Hindu, Business line, Khordha, NH 5 (488 kms: NH No.6 in Jharkhand - Baripada - Baleshwar - Bhadrakh - Cuttack - Bhubaneswar - Khordha - Brahmapur - upto Andhra Pradesh Border) Comments Off on Six-lane expressway between Bhubaneswar and Chandikhole to come up soon

Following is an excerpt from a report in Hindu. (See also http://www.orissalinks.com/orissagrowth/?p=526, http://www.orissalinks.com/orissagrowth/?p=480  and http://www.orissalinks.com/orissagrowth/?p=319 )

Construction companies eyeing the access controlled, six-lane expressway projects of National Highways Authority of India (NHAI) are likely to get investment opportunities for at least four such projects spread over 495 km over the next few months.

They are Chandikhol-Jagatpur-Bhubaneswar (70 kilometre length, estimated cost Rs 761 crore), Delhi-Hapur (47 km, Rs 474 crore), the 198-km stretch of Vijayawada-Elluru-Rajamundri (Rs 1,602 crore) and the 180-km stretch on Delhi-Agra highway (Rs 1,918 crore). The feasibility reports for these projects are already completed and the work is likely to be awarded in about six months, said NHAI officials. Toll collection

These projects are for widening the current four-lane highways into six lanes and operating them for certain durations.

Companies would have to bid competitively for these projects on a revenue-sharing basis. Thus companies would have to bid on the extent of toll revenue that they are ready to share with the Government if they are allowed to operate the roads.

Since these highways are already four-lane stretches, the road operators can start toll collection even during the project construction phase from an ‘appointed date’ (within six months of winning the project), mutually decided by NHAI and the road operator. The toll revenues will be routed to an escrow account.

… From the NHAI perspective, these projects have emerged as money-spinners, with companies willing to foot the entire construction cost and part with two per cent to 48.06 per cent of their revenues in the initial leg of the project.

At the end of the concession period, which is about 12 to 15 years duration, the winning firms have agreed to part with 12 per cent to 59 per cent share of toll revenues.

Samaja editorial on Biju babu’s unfulfilled dream for Kendrapada and Barunei muhana

Barunei, Kendrapada (many interested), Kendrapada Comments Off on Samaja editorial on Biju babu’s unfulfilled dream for Kendrapada and Barunei muhana

Note: Several companies have expressed interest in developing Barunei muhana in Kendrapada as a top notch port. These companies are: Mittal Steel, Adhunik Metallic and SPI infrastructure.

Inaugural run of Bhubaneswar-Ranchi Garib rath on March 7

ECOR, Railways Comments Off on Inaugural run of Bhubaneswar-Ranchi Garib rath on March 7

Following is an excerpt from a report in The economic Times.

The long awaited Garib Rath air-conditioned train between Bhubaneswar and Ranchi will be inaugurated on March 10, railway officials said on Sunday.

While the special inaugural run would be flagged off on March 10 7 from here, schedules for the regular service of the train, proposed to be provided thrice a week, were being finalised, a senior railway official said.

The Bhubaneswar-Ranchi Garib Rath would effectively have eight 3-tier AC coaches, each having a capacity of 78 berths, sources said adding though the train had been announced in the last rail budget, its introduction was delayed because of various reasons.

Perceived as the poor man’s AC train, Garib Rath passenger fare is around 50 per cent less than the three tier AC coach fare in other trains, they said.

There has also been a demand from some political parties and section of public for a long time to extend the Garib Rath train currently running between Secunderabad and Visakhapatnam upto Bhubaneswar, they added.

In regards to the last sentence, how can there be a long standing demand, when the announcement of Secunderabad-Vizag Garib Rath was only made 5 days back. In any case, it is better to extend it before the introduction of the train than after, as the later will create more resentment from the people in Vizag.